Laserfiche WebLink
<br />~.f <br /> <br />l <br /> <br /> <br />. <br /> <br />CACHE LA POUDRE UNIT - COLORADO <br />REXJONNAISSANCE REPORT <br />February 1963 <br /> <br />"' <br />I <br /> <br />U.S.B.R. <br /> <br />Summary <br /> <br />2':'lkl;",." CM"., I II.!/>?,"~ /b"? <br />~"""(f",, ~ncl"..1 ~Qt)b" ;.. <br />Cache La Poudre Unit considered <br /> <br />The Bureau I s Reconnaissance Report for the <br /> <br />construction of a 180,000 a. f. reservoir at Idylwild site in upper Cache La Poudre River <br /> <br />with a power unit and afterbay, a 220,000 a. f. reservoir at the Grey Mountain site below <br /><:U1rtd",.! u,.,J /"<<"...- {'IQ07/_ <br />the mouth of the North Fork of the Poudre with a foreba:y and power caFft<,4"\ II ..,.. he <br />7h. .1dy/w>'l J. po",,.,, cQr"""1y e.;Dc//,f I, e /'l <br />1/ 24,00 K.W. and the Grey Mountain 250,000 K. W. The total project cost would be $111,108,000 <br /> <br />with the power costs amounting to $88,342,000. ( n -;;'.\> Of l"'dU. c~,il <br /> <br />Because of a very low planffactor, the Commissioner of Reclamation instructed <br /> <br />Region 7 to request authorit,y for initiation of a feasibility investigaticn of a first <br /> <br />stage of development consisting of the Idylwild Dam and Reservoir with minimum provisions <br /> <br />for future power development if future studies indicate they are feasible. <br /> <br />Since the Reconnaissance Report deals primarily with the Unit Plan, and only <br /> <br />minor information is given on the initial plan, it is difficult to follow portions of the <br />report with regard to the initial plan of development. '!he initial plan of development will <br /> <br />yield the same amount of M & I water as in the Unit Plan and 85% of the irrigation water. <br /> <br />The essential facts are presented below in tabular form. <br /> <br />Total <br /> <br />169,000 A. F. <br />11,000 A. F. <br /> <br />180,000 A. F. <br /> <br />290' high <br />1,700 acres <br />27,000 c.f.s. <br /> <br />Idylwilde Res. - Active Storage <br />Inactive Storage <br /> <br />Idylwilde Dam - Earth & Rock fill <br />W. S. area at max. <br />Spillway capacit,y <br /> <br />~ <br /> <br />