<br />NEWSLETTER
<br />GRAND VALLEY UNIT, STAGE TWO, CRBSCP
<br />SEPTEMBER 1983
<br />
<br />~~1~
<br />1Gi\@~ ,", '\9~'
<br />l C.,,} ?,~ . ,
<br />\" tf1 .
<br />\\ ..--::-.:fO\N~1' fLl
<br />,\', ~O\...O~f!i~\(',\,~ 13f))>.~.
<br />.....- C "q\li'\'~
<br />,..., l'>\C:.. . ~
<br />C0.'''-
<br />
<br />
<br />.,
<br />
<br />"
<br />
<br />PLAN SELECTED FOR STAGE TWO OF THE GRAND
<br />VALLEY UNIT
<br />
<br />Construction costs for developing Stage Two
<br />are estimated at $140,710,000 based on J,anuary
<br />1983 prices. Implementation of the plan would
<br />reduce salt loading to the Colorado Riv,er by
<br />about 139,700 tons and would result in an
<br />accompanying decrease in salinity at Imperial
<br />~am of about 14.1 mg/L.
<br />
<br />On the basis of technical and economic consid-
<br />erations and recommendations of the Grand
<br />Valley Salinity Coordinating Committee, the
<br />water users, and 'others, a preferred plan has
<br />been selected for the remainder of the Grand
<br />Valley Unit. The Stage Two plan of develop-
<br />ment provides for concrete lining all the
<br />unlined latpraJ s in .the Stage Two arec./ and
<br />-three reaches ';of the Government Hie:hline
<br />'Canal. The weB; end art ion of the Government
<br />Hi hline Canal downstream of the Sta e One
<br />area and all the lateral ,systems would be
<br />constructed tlr$t. A deC1Sl.On about 11ning
<br />tne twO remalnlng reaches of the Government
<br />HLghLlne Canaf-~the mlddle-and- ~ast~~wou1d_
<br />be deferred until deem~cessa~ to meet
<br />sallnity program goals.
<br />
<br />Development is scheduled over a 13-year ,period
<br />with construction beginning in 1986 wi~h the
<br />lining of the west end Government Highline
<br />laterals, the Independent Ranchmen's lat~rals,
<br />and the west end of the Government Highline
<br />Canal. The remainder of the lateraLs would
<br />follow; however, concrete lining of the two
<br />remaining Government Highline Canal rea~hes--
<br />the middle and the east--would be deferr~d, as
<br />previously mentioned.
<br />
<br />STAGE TWO PRECONSTRUCTION ACTIVITIES
<br />
<br />Approximately 700 laterals would be lined for
<br />a total length of about 500 miles. Lateral
<br />lining would generally follow existing aline-
<br />ment and grade.
<br />
<br />Canal improvement would consist of concrete
<br />lining approximately 40 miles of the 47-mile
<br />section of the Government Highline Canal from
<br />Palisade to the canal's terminus 6 mile:s
<br />northwest of Mack. (The additional 7 miles is
<br />the canal segment lined under Stage One.)
<br />
<br />Approximately 75 _percent of the laterals in
<br />the valley are privately owned and opeC:,8ted,
<br />and few incorporated later,al entities"exist
<br />which could constitute legal contr",cting
<br />bodies. Prior to_ initiation of construe'tion,
<br />contracts between the United States and each
<br />independent lateral entity would be nec~ssary
<br />to obtain permission for lateral,constr~ction
<br />on private land and to establish the ground-
<br />work for operation and maintenance agree~ents.
<br />Reclamation, the Soil Conservation Service
<br />(SCS), and the Colorado Cooperative Extension
<br />Service entered into a Memorandum of ~nder-
<br />standing in May 1982 which launched efforts to
<br />formally or'ganize lateral owne,rs into legal
<br />contracting bodies.
<br />
<br />,
<br />I
<br />:J
<br />"
<br />"'
<br />'}
<br />'J
<br />
<br />Proposed wildlife measures are under consider-
<br />ation by Congress. These measures consist of
<br />the acquisition and development of land to
<br />offset wildlife losses expected to occur as a
<br />result of canal and lateral improvement and
<br />development of a wildlife watering pond.
<br />
<br />Design data collection is ongoing in the area
<br />of the west end Government Highline Canal and
<br />its laterals and the Independent Ranchmen's
<br />laterals. Activities include an inventorying
<br />of the existing system, surveying, m:aking
<br />lands and rights-oE-way determinations,
<br />
<br />J
<br />J
<br />;-~
<br />
<br />1/ The Redlands area and the Orchard
<br />Mesa Power Canal laterals are not included
<br />in Stage Two.
<br />
<br />"$
<br />1
<br />;-}
<br />"
<br />;%
<br />,
<br />
<br />'~
<br />
<br />a
<br />
<br />]
<br />
<br />l
<br />
<br />,1
<br />i
<br />,
<br />':~
<br />
<br />"'"
<br />
<br />A
<br />, ,~,'"
<br />
|