Laserfiche WebLink
<br />Q <br />N <br />m <br /><.,it <br /> <br />NEWSLETTER <br />GRAND VALLEY UNIT, STAGE TWO, CRBSCP <br />SEPTEMBER 1983 <br /> <br />~~1~ <br />1Gi\@~ ,", '\9~' <br />l C.,,} ?,~ . , <br />\" tf1 . <br />\\ ..--::-.:fO\N~1' fLl <br />,\', ~O\...O~f!i~\(',\,~ 13f))>.~. <br />.....- C "q\li'\'~ <br />,..., l'>\C:.. . ~ <br />C0.'''- <br /> <br /> <br />., <br /> <br />" <br /> <br />PLAN SELECTED FOR STAGE TWO OF THE GRAND <br />VALLEY UNIT <br /> <br />Construction costs for developing Stage Two <br />are estimated at $140,710,000 based on J,anuary <br />1983 prices. Implementation of the plan would <br />reduce salt loading to the Colorado Riv,er by <br />about 139,700 tons and would result in an <br />accompanying decrease in salinity at Imperial <br />~am of about 14.1 mg/L. <br /> <br />On the basis of technical and economic consid- <br />erations and recommendations of the Grand <br />Valley Salinity Coordinating Committee, the <br />water users, and 'others, a preferred plan has <br />been selected for the remainder of the Grand <br />Valley Unit. The Stage Two plan of develop- <br />ment provides for concrete lining all the <br />unlined latpraJ s in .the Stage Two arec./ and <br />-three reaches ';of the Government Hie:hline <br />'Canal. The weB; end art ion of the Government <br />Hi hline Canal downstream of the Sta e One <br />area and all the lateral ,systems would be <br />constructed tlr$t. A deC1Sl.On about 11ning <br />tne twO remalnlng reaches of the Government <br />HLghLlne Canaf-~the mlddle-and- ~ast~~wou1d_ <br />be deferred until deem~cessa~ to meet <br />sallnity program goals. <br /> <br />Development is scheduled over a 13-year ,period <br />with construction beginning in 1986 wi~h the <br />lining of the west end Government Highline <br />laterals, the Independent Ranchmen's lat~rals, <br />and the west end of the Government Highline <br />Canal. The remainder of the lateraLs would <br />follow; however, concrete lining of the two <br />remaining Government Highline Canal rea~hes-- <br />the middle and the east--would be deferr~d, as <br />previously mentioned. <br /> <br />STAGE TWO PRECONSTRUCTION ACTIVITIES <br /> <br />Approximately 700 laterals would be lined for <br />a total length of about 500 miles. Lateral <br />lining would generally follow existing aline- <br />ment and grade. <br /> <br />Canal improvement would consist of concrete <br />lining approximately 40 miles of the 47-mile <br />section of the Government Highline Canal from <br />Palisade to the canal's terminus 6 mile:s <br />northwest of Mack. (The additional 7 miles is <br />the canal segment lined under Stage One.) <br /> <br />Approximately 75 _percent of the laterals in <br />the valley are privately owned and opeC:,8ted, <br />and few incorporated later,al entities"exist <br />which could constitute legal contr",cting <br />bodies. Prior to_ initiation of construe'tion, <br />contracts between the United States and each <br />independent lateral entity would be nec~ssary <br />to obtain permission for lateral,constr~ction <br />on private land and to establish the ground- <br />work for operation and maintenance agree~ents. <br />Reclamation, the Soil Conservation Service <br />(SCS), and the Colorado Cooperative Extension <br />Service entered into a Memorandum of ~nder- <br />standing in May 1982 which launched efforts to <br />formally or'ganize lateral owne,rs into legal <br />contracting bodies. <br /> <br />, <br />I <br />:J <br />" <br />"' <br />'} <br />'J <br /> <br />Proposed wildlife measures are under consider- <br />ation by Congress. These measures consist of <br />the acquisition and development of land to <br />offset wildlife losses expected to occur as a <br />result of canal and lateral improvement and <br />development of a wildlife watering pond. <br /> <br />Design data collection is ongoing in the area <br />of the west end Government Highline Canal and <br />its laterals and the Independent Ranchmen's <br />laterals. Activities include an inventorying <br />of the existing system, surveying, m:aking <br />lands and rights-oE-way determinations, <br /> <br />J <br />J <br />;-~ <br /> <br />1/ The Redlands area and the Orchard <br />Mesa Power Canal laterals are not included <br />in Stage Two. <br /> <br />"$ <br />1 <br />;-} <br />" <br />;% <br />, <br /> <br />'~ <br /> <br />a <br /> <br />] <br /> <br />l <br /> <br />,1 <br />i <br />, <br />':~ <br /> <br />"'" <br /> <br />A <br />, ,~,'" <br />