Laserfiche WebLink
<br /> WESTERN AREA POWER ADMINISTRATION <br /> POSSIBLE SCHEDULE <br /> c/// FOR GeES STUDY FLOWS <br /> December 1989 <br />Minimum Target Maximum Target Release Max illlUm Ramping Rates <br />Release Tolerance Release Tolerance Fluctuat ion Up Down <br />(cfs) II (cfs) 21 (cfs) 31 (cfs) 41 (cfs) (cfs/hr) (cfs/hr) Period <br />1,000 :!: 250 25,000 :!: 2,500 24,000 7,200 7,200 Dee, Jan, Feb <br />1.000 :!: 250 20,000 :!: 2,000 19,000 7,200 7,200 Dee, Jan, Feb <br />1,000 :!: 250 20,000 :!: 2,000 19,000 3,600 3,600 Oct, Nov <br />3,000 :!: 750 25,000 :!: 2,500 22,000 7,200 7,200 July, Aug <br />3,000 :!: 750 15,000 :!: 2,500 22,000 3,600 3,600 Apr, May, June <br />5.000 :!: 1,250 25,000 :!: 2,500 20,000 7,200 7,200 July, Aug <br />5,000 :!: 1,250 15,000 :!: 1,500 10,000 7,200 7,200 Apr, May, June <br />5,000 :!: 1,250 25,000 :!: 2,500 20,000 3,600 3,600 July, Aug <br />5,000 :!: 1,250 15,000 :!: 1,500 10,000 3,600 3,600 Apr, May, June <br /> <br /> <br />!I Minimum release is assumed an average target release rather than an absolute minimum. <br />U Minimum release target tolerance is :!: 25 percent. <br />H Maximum release is assumed an average target release rather than an absolute maxilllUm. <br />~I Maximum release target tolerance is :!: 10 percent. <br />