My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00480
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:11:51 AM
Creation date
10/11/2006 9:47:12 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8059
Description
Section D General Studies-State Water Plan
State
KS
Date
1/1/3000
Title
State Water Plan Land Resources-Colorado State Water Plan-Kansas State Water Plan Statistics
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-... / <br />\" <br />',' <br />. " <br />, <br /> <br />COLORADO STATE WATER PLAN <br /> <br />Kansas State Water Plan Statistics <br /> <br />USER sub~~con. i~~igation suitability <br /> <br />16,189,520 acres <br /> <br />Conservation Needs (Type I Studies) <br /> <br />" <br /> <br />39,356,000 <br /> <br />Cultivated land (total) <br /> <br />" <br /> <br />29,579,000 <br /> <br />Total Land in Kansas <br /> <br />52,648,920 <br /> <br />" <br /> <br />During the Bureau investigation, some land only 10 inches to bedrock waS <br /> <br />found to be placed in an irrigable class by the Type I studies. The 39 <br /> <br />million plus is equal to 75% of the total land area which is practically <br /> <br />an impossibility. The Bureau projects usually sverage 50% of total project <br /> <br />area as irrigable and these are picked areas. I certainly don't want this <br /> <br />situation to happen in Colorado. <br /> <br />It will not be possible to complete the entire subrecon. in Eastern Colorado <br /> <br />before the scheduled date for the Interim Report. However, this work could <br /> <br />be continued past the Interim Report date and the completed county maps used <br /> <br />as data-in-support for the final report. This information would then be <br /> <br />available for future planning needs. <br /> <br />..?O$3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.