My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05616
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC05616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:16:54 AM
Creation date
10/9/2006 5:24:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.950
Description
Section D General Studies-General Water Studies
State
CO
Date
7/1/1976
Author
CWCB
Title
Summary Sheets-Updates-Feb 1978-Fruitland Mesa Project 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />-' <br /> <br />081893 <br /> <br />Fte~ E. j)1'll/I3E.e r <br />. CtuU5 <br /> <br />I <br />, <br /> <br />July 1976 <br /> <br />, <br />/<'..1 <br /> <br />. SllMMARY SHEETS <br /> <br />" <br /> <br />, <br /> <br />Fruitland Mesa Proiect <br /> <br />LOCATION <br /> <br />The Fruitland Mesa Project is located in west central Colorado in the <br />Gunnison River Basin of the Upper Colorado River Basin. <br /> <br />PURPOSE <br /> <br />The project would develop unused water supplies from Soap, Curecanti, <br />and Crystal Creeks, for irrigation of supplemental and full service <br />land between the Black Canyon of the Gunnison National Monument and <br />the town of Crawford. Benefits would also be provided for recreation, <br />fish, and wildlife. <br /> <br />STATUS <br /> <br />The Fruitland Mesa Project was authorized for construction September <br />2, 1964, (Public Law 88-568) as a participating project under the <br />Colorado River Storage Project Act of April II, 1956 (Public Law 84- <br />485). A definite plan report was completed in June 1967. Because <br />of changes in plan, costs, and benefits the definite plan report is <br />being revised and is scheduled for completion. <br /> <br />A repayment contract with the Fruitland Mesa Water Conservancy District <br />was signed in 1969. An archaeological survey of the project was com- <br />pleted in August 1975. Expressions of interests are being received <br />from A & E contractors for selection of a firm to prepare designs for the <br />Soap Park Access Road. <br /> <br />The FY 1976 Public Works Appropriation Act included $957,000 for FY 1976 <br />and $150,000 for the transition quarter to begin construction of the <br />project. The President's ,budget tor FY 1977 includes $3,000,000 to continue <br />, . <br />construction. . <br /> <br />~ <br /> <br />project water would be obtained from Soap, Curecanti, and Crystal Creeks. <br />Regulation of project water supplies ~ould be provided at the potential <br />Milly K. Goodwin Lake on Soap Creek and at the existing Gould Reservoir <br />on Iron Creek. <br />
The URL can be used to link to this page
Your browser does not support the video tag.