Laserfiche WebLink
<br />000231 <br /> <br />Agenda <br />DSS Staff Meeting <br />Monday September 23, 2002 <br /> <br />Meetings are at 9:30 every other Monday, <br />RGDSS <br />1) Ground Water (HRS) - RayB <br />. Last met on 9/18, <br />· Average Monthly calibration budget for HRS is done, All Phase 3 enhancements <br />except Stream program are operational. Iu general, the phase 3 water budget <br />a results and input data are better but well residuals continue to be relatively <br /> <br />, l~or. ' <br />. e first Monthly calibratiou runs were completed. Results, except streams that <br />were unavailable, were very similar to Average Monthly. HRS was able to run <br />the monthly without any major obstacles; a credit to the GW team and data <br />centered approach trying to be implemented. One result of ruuning the monthly <br />model was a recognition that pumping and recharge cannot currently be <br />separated by sprinkler Vs non-sprinkler land because StatePP was not <br />developed to handle irrigated land as a time series, <br />. Comments ou the StatePP the enhancements for pumping were provided to <br />HRS last week. <br />. Contingency 23 to speed up post processing of stream and diversion results <br />approved and results preseuted. Results look valuable. Documeutation is <br />expected soon. <br />. Issues related to revising drain elevations to insure a downhill gradient has been <br />requested, Jana began checking, Jana is expected to get 1-2 hours oftraining by HRS <br />staff when she is available sometime this week, <br />· Review of map format by Andy has begun. RayB was unable to use contour <br />maps to evaluate potential subirrigation by alfalfa lands; lines in ArcView <br />coverage but no data. Per Email, Eric is working with Bruce to revise. <br />. Willem proposal to apply Kriging techniques under review as a parallel effort by <br />RayB, No progress to date, <br />. Willem information to process total ET (StateCU, Modflow, and Precipitation), <br />written in Perl provided, No progress to date, <br /> <br />2) Ground Water (State) - RayB <br />· Request for stream mapping by RG restoration project obtained by RayB, Need to <br />evaluate, <br />· Peer Review #6 on Streams and observation wells scheduled for 9/30, <br />. Brian continues to work at HRS and focus on average monthly calibration, <br /> <br />3) Division 3 Activities - RayB <br />· Division 3 stream control survey is occurring, RayB will check on progress, <br />. Div 3 is continuing to evaluate the coverage of wells not assigned to irrigated lands <br />(approx, 2,500 wells), No progress reported, RayB will check, <br /> <br />4) Surface Water - RayB <br />. Hydrosphere and Leonard Rice completed contract arrangements that will allow EdA <br />to finish RGDSS SW activities, <br /> <br />c:\ W\RioGrande\ Word\Mt020923 ,doc <br /> <br />09/23/02 - 1 <br /> <br />\ <br /> <br />II <br />,I' ,I <br />, ~ <br />/;' f'7 ' <br />(j;;(~f ~/ <br />~.jO / <br /> <br />\ " <br />~.,(j"; <br />, ~ <br />~~ <br />1~ <br />/)/ <br />~ ~\/ <br />~t (I;" <br />~JY P/1 <br />) It o~ <br />~e/~ <br /> <br />