Laserfiche WebLink
<br />AGENCY NAME: Water Conservation Board <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: <br /> <br />$ 308,000 <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this I () day of (J{f'lm&L, 1998, by and <br />between the State of Colorado for the use and benefit of the Department of Natural Resources, <br />Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, and the <br />Greeley and Loveland Irrigation Company, hereinafter referred to as the BORROWER and/or <br />CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1, Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Organization YYYY, Appropriation L98, GBL GLlC, Program WTRC, Object Code <br />5120, Reporting Category: 3835, Contract Encumbrance Number C153835A <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies, <br /> <br />3, Pursuant to the provisions of SS 37-60-119 and 37-60-120, C,R.S. (1997) the STATE is authorized <br />to loan money for the construction of water projects for the benefit of the people of the STATE, <br />provided that the borrower assures repayment of that money, <br /> <br />4, The BORROWER is a duly constituted Colorado ditch and reservoir company formed pursuant to SS <br />7-42-101 et sea, and 7-40-101 et sea., C,R.S., located in Larimer County, State of Colorado, <br /> <br />5, The BORROWER has applied to the STATE for a loan to be used for rehabilitation of the dam and <br />outlet works of the BORROWER'S Equalizer Reservoir, hereinafter referred to as PROJECT, at a cost <br />of $426,000, <br /> <br />6, The STATE has reviewed a feasibility report compiled by ECI, which is incorporated herein by <br />reference, and was financed in part by CWCB (Loan Contract No, C153788, dated December 8, <br />1997), and, based upon this feasibility report, the STATE determined the PROJECT to be technically <br />and financially feasible, <br /> <br />7, At its November 24-25, 1997 meeting, the CWCB approved a loan to the BORROWER in an <br />amount up to $308,000, not to exceed 80% of the cost of the PROJECT, at an interest rate of <br />4,21 % per annum for a duration of 30 years, <br /> <br />8, Pursuant to House Bill 98-1189, Section 1, the Colorado General Assembly authorized CWCB to <br />loan to the BORROWER an amount of $308,000 for the PROJECT, <br /> <br />9, The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br />mutually agreeable terms and conditions, <br /> <br />Greeley & Loveland <br />Irrigation Company <br /> <br />Page 1 Df 13 <br /> <br />Loan CDntract <br />