My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150016 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150016 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 9:39:45 AM
Creation date
10/6/2006 12:21:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150016
Contractor Name
Idaho Springs, City of
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
HB 98-1189
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: 02 PDA (j{)OtPt'( <br /> <br />Contract Amendment No.1 <br /> <br />This Amendment, made this 1st day of March 2002, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado <br />Water Conservation Board, hereinafter referred to as CWCB or STATE, and the City of <br />Idaho Springs, acting by and through the City of Idaho Springs Water Activity Enterprise <br />hereinafter referred to as the BORROWER and/or CONTRACTOR, P.O. Box 907, Idaho <br />Springs, Colorado 80452. <br /> <br />Factual Recitals <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and <br />otherwise made available and a sufficient unencumbered balance thereof remains <br />available for payment in Fund Number 424, Appropriation Code L98, Contract <br />Encumbrance Number C150016. <br /> <br />B. Required approval, clearance, and coordination have been accomplished from and <br />with appropriate agencies. <br /> <br />C. The CWCB and the CONTRACTOR entered into Contract Encumbrance Number <br />C150016, dated December 18, 2000, hereinafter referred to as ORIGINAL CONTRACT, <br />incorporated herein by reference, wherein the CWCB agreed to loan money in the <br />total amount of $955,000, and the CONTRACTOR agreed to repay the loan in <br />accordance with the terms of the ORIGINAL CONTRACT. <br />~ <br /> <br />D. During construction of the PROJECT, the CONTRACTOR encountered unforeseen site <br />conditions, design modifications, and additional work due to changes instituted by a <br />regulatory agency not anticipated in the original project cost estimate. These items <br />increased the cost of the PROJECT by $280,000. To meet the increased costs, the <br />CONTRACTOR requested an additional $210,000, for a total loan amount of' <br />$1,165,000. <br /> <br />E. H.B.00-1419, Section 1(2) provides that the CWCB may increase authorized loan <br />amounts as may be justified by "reasons of ordinary fluctuations in construction <br />costs as indicated by the engineering cost indices applicable to the types of <br />construction required for each project or as may be justified by reason of changes in <br />the plan for a project due to differing or unforeseen site conditions, errors or <br />omissions in the plans and specifications, changes instituted by regulatory agencies, <br />or changes in material quantities beyond contract limits." <br /> <br />City 01 Idaho Springs <br /> <br />Page 1014 <br /> <br />Contract Amendment No.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.