Laserfiche WebLink
<br />., <br /> <br />. <br /> <br />. <br /> <br />,\ <br /> <br />CONTRACTOR: 'COLORAOO RIVER WATER <br />CONSERVATION DISTRICT, ACTING BY AND THROUGH <br />ITS COLORADO RIVER WATER PROJECTS ENTERPRISE <br />Contract No. C 150074 <br />Contract Amount $500,000 <br /> <br />Agency Name: Water Conservation Board <br />Agency Number PDA <br />. Routing Number D:J.. fbA IJO~ <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this 16th day of November 2001, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ("CWCB" and/or "STATE"), and the Colorado River Water Conservation <br />District, acting by and through its Colorado River Water Projects Enterprise, P.O. Box 1120, <br />Glenwood Springs, CO B1602 ("CONTRACTOR"). <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for <br />payment as follows: Fund Number 424, Organization YYYY, Appropriation Code ELK, GBL <br />C074, Program WTRC, Object Code 5180, Contract Encumbrance No. C150074 <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. CWGB's authority for making this nonreimbursable expenditure: Construction Fund: <br />Section, 37-60-121(1)(b)(IV), C.R.S., authorizes the CWCB to make nonreimbursable <br />expenditures from the CWCB Construction Fund with specific authorization from the <br />General Assembly. <br /> <br />4. The Project Summary, attached as Appendix 1 and incorporated herein, contains <br />Contractor Information (Section 1) and Project Description (Section 2). <br /> <br />5. Board approval and legislative approval, if required <br /> <br />a. At its January 24-25, 2001 meeting, the CWCB approved a nonreimbursable <br />expenditure for the PROJECTto the CONTRACTOR in an amount up to $500,000. <br /> <br />b. Pursuant to S.B. 01-157, Section 12, the Colorado General Assembly authorized CWCB <br />to expend up to $500,000 for the PROJECT as its participation in obtaining the necessary <br />feasibility studies associated with the enlargement of Elkhead Reservoir. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants contained <br />herein, the parties agree as follows: <br /> <br />A. Performance of PROJECT. The CONTRACTOR has selected Ayres and Associates and will <br />hire another consultant (collectively referred to as "CONSULTANTS") to perform the PROJECT, <br />and has approved the Study Plan attached as Appendix 2 and incorporated herein. The <br />CONTRACTOR shall require the CONSULTANTS to perform the PROJECT tasks generally in <br />accordance with said Study Plan. <br /> <br />B. Time of performance. The CONTRACTOR recognizes that time is of the essence in the <br />performance of its obligations under this contract. Therefore, the CONTRACTOR shall be <br /> <br />Page 1 of 7 <br />