My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150081 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150081 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2014 4:24:37 PM
Creation date
10/6/2006 12:19:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150081
Contractor Name
Victor, City of
Contract Type
Loan
Water District
12
County
Teller
Bill Number
HB 95-1155
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />>. <br /> <br />STATE OF COLORADO <br /> <br />Q <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br /> <br />Mike Serlet ~ <br />Bill Green 13 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />FROM: <br /> <br />DATE: June 28, 2001 <br /> <br />SUBJECT: City of Victor Feasibility <br /> <br />Background <br /> <br />In January 1995, the Board recommended a $600,000 loan to the City of Victor for the <br />rehabilitation of Victor No, 2 Dam (subsequently authorized in HB 95-1155). Two <br />conditions of Board approval were: (1) the City must submit an acceptable feasibility <br />study, and (2) staff must complete a final evaluation of the City's ability to repay the <br />loan, <br /> <br />Feasibility Study <br /> <br />The feasibility study was prepared over a period of about 13 years with the final <br />installment, Chapter VIII, Financial Program, submitted to us in December of last year. <br />I don't have access to my copies of the feasibility studies right now but I think my only <br />concern, other than the financial considerations, was the cost estimate which appeared to <br />be too low at about $800,000 and was later increased in the financial chapter to about <br />$1,124,000. In addition to the CWCB loan, funding for the project will come from a <br />Department of Local Affairs grant of about $278,000 and from the City. <br /> <br />Financial Feasibility <br /> <br />The City has a combined water and sewer fund. The financial program in the feasibility <br />study (cash flow for the 20 years of debt retirement) was based on the assumption that the <br />City would establish a separate water fund since we did not expect that Rural <br />Development would grant parity on their loan to the City. <br /> <br />RD did grant parity on May 9 and I revised the financial program to reflect repayment <br />from a combined water and sewer fund. A copy of my financial projection is attached as <br />Table 1. The table indicates that revenues should exceed expenditures by a relatively <br />small amount in each year of debt retirement. (I estimated the annual debt service on the <br />RD loan at $54,000 but wasn't able to verify that beyond the next seven years.) The loan <br />was approved at 4.0 percent for 30 years but the City has indicated it would prefer 20- <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.