My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00260
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:46:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153484
Contractor Name
San Luis Valley Water Conservation District
Contract Type
Grant
Water District
0
County
Rio Grande
Bill Number
FSG
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/' <br /> <br />.~ <br /> <br />.;le 89 Jf1d- <br /> <br />Fonn 6-AC.D2A Ill. '/8.51 <br />W!FRPB <br />Upper Rio <br />Grande Study <br /> <br /> <br />FEASIBILITY P~PORT <br />CONTRACT SECOND AJ-lENDHENT <br /> <br />THIS CONTRACT. mad, this /1' tJ;:- d.y of ~~ 19S 2... . by .nd b<tw,," th, <br />Stal~ of Colorado for the use and tJem:fil of the Oepa em of 1 Natural Resources <br />(rnlnr~nn Water ~onservation Board), <br />hereinafter ~(el"J'ed to as the Slate, and '2 the San Luis Valley water Conservancy <br />nisrrict. p O. BOX 43. Monte Vista, CO 81144, <br />~rdnafter ~fernd to as the COnll'3l:101' IContractor. <br /> <br />WHEREAS. authorit)' exists in the law and Funds have bun budgeted. appropriated and otherwiS(: made <br />aVailable and a sufficient .unencumbered balance thereof remains available for paYrflenl in Fund Number 4008 <br />C1L Account Number 5281 X . Contract Encumbrance NumberC 15 3 4 8 4 : and <br />ABL Account No. 12810, Org. Unit 77-77-777, <br />WHEREAS. required apPnlv~nce and coordinalion has been accomplished from and with lIppropriale <br />8grneir5: and <br /> <br />WHEREAS~ a conttact and a contract amendment were entered <br />into on January 5. 1987, and on October 1. 1987. respectively. <br />Contract Encumbrance Number C-153484 (the Original Contract and <br />the First Amendment)'. between the State and the Contractor~ <br />w~ich by their termS are still in effect; and <br /> <br />WHEREAS~ the Contractor has performed wor~ pursuant to the <br />Original Contract and to the First Amendment as part of the <br />feasibility report; and <br /> <br />WHEREAS. to dat~ the State has paid to the Contractor <br />Sixty-Eight Thousan~ Four Hundred Dollars ($68,400) of the <br />total of Seventy-TwO Thousand Dollars ($72.000) required of the <br />Original Contract afid the First Amendment; and <br /> <br />WHEREAS. the fe~sibility report in the Original Contract <br />was designed to respond to all concerns expressed by COlorado <br />water interests in the Upper Rio Grande Basin of the State of <br />Colorado: and <br /> <br />WHEREAS. the State had to review the feasibility report <br />assumptions in regard to all provisions of the Rio Grande <br />Compact; and <br /> <br />WHEREAS~ the State also had to review the feasibility <br />repo~t assumptions in regard to the future operation of the <br />Closed Basin Project~ which is a project funded mainly by the <br />Federal Government (U.S. Bureau of Reclamati6n); and <br /> <br />WHEREAS~ during the performance of the Contractor's work~ <br />pUblic meetings were held concerning the feasipility report for <br />this project; and <br /> <br />WHEREAS~ statements made at the public meetings indicated <br />that the Plan of Study outlined in Exhibit A ot the Original <br />Contract needed to include additional alternatives and/or to <br />address 'additional concerns; and <br /> <br />.W~REAS. after the above reviews and public meetin9s~ it <br />was d~cided by the state in December. -1987~ in consultation <br />with the Contractor. that additional alternatives should be <br />developed and analyzed so that a more complete picture of~the <br />proposed pro ject could be formed; and <br /> <br />WHEREAS~ because of the necessity of the a~ove reviews and <br />the time required to perform the reviews. and because of the <br />decisions to develop other a1ternatives~ the Skate. through the <br />Director "of the Colorado Water Conservation BOilrd. and the <br />Contractor verbally agreed~ prior to January 1, 1988. that the <br />Co~tractor could not furnish a" final repo~t to the State by <br /> <br />6761E <br /> <br />:.i95-:5J.01-1014 <br /> <br />Pa!!e I of~pa!!es <br />
The URL can be used to link to this page
Your browser does not support the video tag.