<br />--~
<br />~' .~'.~r\-:,,:~t:, ,:~~:.~< . .',/.t,,: ,~'"'i;~('l: "" . i.~-':,! '~r , ."
<br />
<br />..;.
<br />
<br />.~.
<br />.';<,r "':-~ ~t".-';.~:-"",-: )f.r<:'!i-~.;. :'.~-V~~+~'-" J~-:;;'~' ~<
<br />
<br />Form 6-AC-02
<br />
<br />DEPARTMENT OR AGENCY NUMBER
<br />
<br />,CONTRACT
<br />
<br />
<br />mls CONTRACT, made this 6th day of December
<br />State.of Colorado for the use and benefit of the Department of'1 N;:Jt'nr;:Jl
<br />r.nl nr;:!'nn tJ.::It'pr r.nn~p.nT;:!t'i nn Rn::lrn
<br />hereinafter referred to as the State, and "2 M(1)prm; t'h ~ ~rhll~rpr}
<br />Rox_?R, Cerlaredge. Colorado 81413
<br />hereinaf~er referred to as the contractor,
<br />
<br />197-9; by and beh;"een th~:
<br />'Rp~nllr("'p~ J
<br />
<br />!=:r.::lr Rnllrp 1 J
<br />
<br />. WHEREAS, authority exis~s ~ th.e Law and Funds, have been budgeted, appropriated and 'otherwiSe 'made
<br />available 'and a sufficient unencumber~d balance thereof remains available for payment inFund Number 1001,
<br />G/L Account Number51957 "Contract Encumbrance Numbe~/q.5t~.z-;and
<br />
<br />WHEREAS, required approval; clearance and coordination ha~ been' accomplished from and with appropriate
<br />agencies; and
<br />
<br />. WHEREAS, "3 pursuant to the provisions of 149-1-22, Colorado Revised
<br />Statutes 1963, as amen~e~, the Colorada Water Conservation Board is
<br />autharized ta canst~ct certain water prajects far the benefit .of the
<br />, people .of the state of Calarada; and
<br />
<br />, WHEREAS, the Cedar Mesa Ditch CP. has made application to the Board
<br />far the canstruction .of a water project far the purpose .of supplying
<br />irrigatian water to the inhabitants, af,the, areas served by the
<br />applicant; and
<br />
<br />WHEREAS,
<br />the State of
<br />related 'work
<br />Colorado;
<br />
<br />the Contract .or is a professianal engineering firm within
<br />Colarada, and has previously dane considerable water-
<br />for various municipalities ~nd' irrigation companies in .
<br />. !. ..,.
<br />
<br />.
<br />
<br />NOW J:HEREFORE, it is hereby agreed that
<br />
<br />I. ., The Contractor agrees ta prepare a feasibility repart ta
<br />study:
<br />
<br />headgates
<br />Creek and
<br />
<br />a. The construction of a "controll1 reservoir near the
<br />.of the Cedar Mesa Ditch Ca. ta stare the "bulge" in Surface
<br />deliver a steady flow of irrigatian water to Cedar Mesa.
<br />
<br />,the loss
<br />
<br />b., The rehabilitation of, the Cedar Mesa ditch to prevent
<br />of water due to seepage and transpiration.
<br />
<br />The above study is 'to be in accardance with a proposal dated
<br />November 27, 1974 for a praject feasibility repart prepared by the
<br />Contractor and approved by the Calorada Water Conservatian Baard. Said
<br />proposal is attached hereta as ,Exhibit A and,made part .of this contract.
<br />
<br />2. Thirty (30) capies .of the repart called far in this contract
<br />shall be furnished ta the State nat later than March 31, 1975, unless
<br />such time is ,extended by mutual agreement .of the parties hereto.
<br />
<br />, 3. As'campensation far the, services of the Cantractor, the
<br />State agrees to pay to the Cantractar the sum .of Three Thousand Seven
<br />Hundred'Fifty Dollars ($3,750.00) in the manner fallowing:
<br />
<br />a. Sixty percent (60%), to wit, Two Thousand Two Hundred
<br />Fifty Dallars ($2,250.00), of the tatal amaunt due intwa equal monthly
<br />,installments of One Thousand One Hundred Twenty-Five Dollars ($1,125.00)
<br />each, commencing an January 31, 1975.
<br />
<br />Page .. of-2.. pages
<br />~(~ instructions on .reverse of last. page.)
<br />
<br />',<
<br />
|