<br />form 6.AC-02A
<br />
<br />f' 1l:+- (O.:J--{
<br />DEPAI ENT OR AG NCV NUMBER
<br />34-u4-00
<br />CONTRACT ROlfflNG NUMBER
<br />.:L
<br />
<br />no encumbrance
<br />CONTRACT AMENDMENT
<br />
<br />. 1982. by and between 'the
<br />Natural Resources
<br />
<br />THIS CONTRACT, made this 1st day of January
<br />State of Colorado for the use and benefit of the Department of .,
<br />(Colorado Water Conservation Board),
<br />hereinafter refcrred to as the State and.2 ute Water Conservancy
<br />P. O. Box 460, Gt"and Junction, ,CO 81501,
<br />hereinafter referred to as the contractor,
<br />
<br />District.
<br />
<br />'WHEREAS, authority exists' in the Law and Funds have been budge.ted. appropriated and otherwise made
<br />available and a sufficient unencumbered 'balance thereof remains aVailable for payment in Fund Number. 4 n n R .
<br />G/L A.ccount Number 53117,. Contract Encumbrance Number C15312 q; and
<br />
<br />WHEREAS, required appro~al, clearance and coordination has been accomplished from and with appropriate
<br />agencies; and
<br />
<br />WHEREAS, the ,State and the Contractor did on September is,
<br />1980, enter into a contract for State participation.in the
<br />construction :of the Ute Water Conservancy District project for
<br />the benefit -of the members of the nistrict in Mesa County,
<br />Colorado, which ,contract is attached hereto as Exhibit A and
<br />u hereby incorpo!ated. herein; and
<br />
<br />WHEREAS, the project described in that certain contract of
<br />'. September 15, 1980, was constructed with les!; money than what
<br />was originally estimated by the engineer; and
<br />
<br />WHEREAS, the Contractor wishes to spend the remaining
<br />money made available 'in that certai.n contract: of September 15,
<br />1980, to construct an additional portion of the project;
<br />
<br />,)
<br />
<br />NOW, THEREFORE, in consideration of.the mutual and
<br />dependent covenants herein contained, it ~s agreed by the
<br />parties hereto as follows:
<br />
<br />1. The terms and provisions of paragraph A.2. of that certain
<br />contract 'dated September 15, 1980, attached hereto as Exhibit A
<br />and incorporated herein by reference shall no longer be
<br />effective but shall be amended to read as follows:
<br />
<br />",
<br />
<br />A. 2. Conveyor cause title to be' conveyed by deed or
<br />other proper ,conveyance to the State th~ following
<br />portions of the _proposed project facilities:
<br />
<br />a. A five-million-gallon water tank with all
<br />appurtenances to be located within 4.839 acres of land, as
<br />described in Appendix A
<br />
<br />b. 4.839 acres o~ .land, as described in Appendix A
<br />
<br />c. A 24-inch diameter steel pipe, 2690 + feet in length,
<br />with all appurtenances
<br />
<br />',)
<br />
<br />d. An alti.tude valve and vault connected to the system
<br />
<br />e. A 12-inch diameter asbestos cement pipe, 284 + feet in
<br />length, with all appurtenances
<br />
<br />f. A 24-inch diameter steel yard pipe, 64 + feet in
<br />tength, with ail appurtenances
<br />
<br />All items in c to f are located in Section 19, T1S, 'R1w,
<br />Ute Principal _Meridian, South of the Colorado River in the
<br />R€dlands, as. shown in Appendix B.
<br />
<br />Page 1 of...!!..- pages
<br />.(SecinSlrllctionson rcvcrscorlasl page.)
<br />
<br />I
<br />\
<br />
|