My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00084
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:35:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150139
Contractor Name
Coal Creek
Contract Type
Loan
Water District
0
County
Fremont
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ST A TE OF COLOR A DO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone, (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />March 28, 2003 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWeB Director <br /> <br />Dan McAuliffe <br />Dprmtv DiTPctor <br /> <br />Mr, Charles Hastings, Mayor <br />Town of Coal Creek, <br />P,O, Box 36 <br />Coal Creek, CO 81221-0036 <br /> <br />RE: Purchase of water rights <br />Loan Approval <br /> <br />Dear Chuck, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your request for a Small Project Loan from the Construction Fund, I understand <br />the loan will be used to purchase water rights for municipal use, <br /> <br />The Board approved a loan from the Construction Fund in a maximum amount of <br />$67,500 at the loan terms of 3.75% for 30 years, The approval includes the provision for a <br />1 % ($675) loan service charge, which may be paid at closing, or financed along with the <br />loan. I have attached a copy of the updated Board memo concerning the Town of Coal <br />Creek, Please refer to page 3 of that memo and to the section "Action taken by the <br />CWCB March 26, 2003," <br /> <br />When the Board approves a Small Project Loan from the Construction Fund there remain <br />several conditions: <br /> <br />a) A Fp.Flilihility Sturly iil rp.qIJirp.d We have reviewed the March 14, 2003 study titled <br />Feasibility Study, Town of Coal Creek Water Acquisition Project. The report meets <br />the requirements of the CWCB Construction Fund Guidelines for feasibility studies, <br />and has been accepted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.