Laserfiche WebLink
<br />FPR 98-463 <br />City of Longmont <br /> <br />COLORADO WATER CONSERVATION BOARD <br />721 State Centennial Building <br />1313 Shej1Jlan Street <br />Denver, Colorado 80203 <br /> <br />May jI, 1998 <br /> <br />RESOLUTION <br /> <br />PREVIOUSLY DESIGNATED FLOODPLAIN STUDIES <br /> <br />WHEREAS, the following floodplain studies have been, completed for the City of <br />Longmont as listed in Table I: <br /> <br />Taple 1 <br />Existinl! Floodolain Studies within the Citv ofLonl!:mont <br /> <br />Ref. Report Resolution' <br />No. Study Name Author Dllte No. <br />] Flood Plain Information, Left-Hand Creek, U.S. Army Corps of Jamiary 4 <br /> Volume], Boulder County, Colorado Engineers, Omaha ]969 <br />2 Flood Plain Information, Lower St. Vrain U.S. Army Corps of June] 972 24 <br /> Creek, Volume III, Bou]der County, Engineers, Omaha <br /> Colorado District <br />3 F]ood Insurance Study, City of Longmont, Federal Emergency January 77 <br /> Colorado Management Agency 1977 <br />4 Floodplain Information and Flood Control Water Resource Apri] 1980 ]73 <br /> & Drainage Plan, Dry Creek No. ] Consultants, Inc. <br />5 Floodplain Information, Flood Control and Water Resource April 198] 230 <br /> Floodplain Management Plan For St. Vrain Consultants, Inc. <br /> Creek at Longmont, Colorado <br />6 Floodplain Information Report, Lefthand Gingery Associates, December 186 <br /> Creek, Volume I, (Mouth to Foothills Inc. ]981 <br /> Highway) I <br />7 Flood Insurance Study, City of Longmont, Federal Emergency August ], 354.12 <br /> Colorado Management Agency ]983 <br />8 Flood Insurance Study, City of Long mont, Federal Emergency September 463 <br /> Colorado Management Agency ]8, ]987 (proposed) <br />9 Flood Insurance Study, Boulder County, Federal Emergency June 2, 1995 Undes. <br /> Colorado Management Agency <br /> <br />and; <br /> <br />- <br />