My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02521
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:45 PM
Creation date
10/4/2006 7:16:57 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - Informational Items - Pinon Mesa Ranches Community Association - Raw Water System
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />721 Centennial Building <br />1 31 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (30)) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br />J<lmes S. Lochhead <br />Executive Direaor, DNR <br />Daries C. Lile, P.E. <br />Director, eWeB <br />Peter H. Evans <br />Acting Director, eWeB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />~~, <br />Bill Stanton, P ,E" Chief, Project Planning and Construction Section'N. . <br />Mike Serlet, P,E" Project Manager~ <br /> <br />September IS, 1998 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Agenda Item 15a - September 21-22, 1998, Board Meeting <br />Water Project Construction Loan Program - Informational Items <br />Pinon Mesa Ranches Community Association - Raw Water System <br /> <br />Introduction <br /> <br />This item is presented to update the Board on the current situation with respect to the <br />Pinon Mesa Ranches Community Association's (PMRCA) raw water project. <br /> <br />Backl!round <br /> <br />At the July Board meeting in Telluride and the Special Board meeting on June 16, 1998 <br />the Board approved the following to be completed in chronological order: <br /> <br />I, The CWCB enter into a 3-party agreement with PMRCA and RMI Environmental <br />Services, Inc" ensuring RMI's construction and operation of a Reverse Osmosis (RO) <br />system at the PMRCA reservoir, and PMRCA's ability to make its annual loan <br />payment to the CWCB, <br /> <br />2, Disbursement of the remaining funds of the original $206,000 contract prior to the <br />time an amended contract is in place, <br />
The URL can be used to link to this page
Your browser does not support the video tag.