Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866.4474 <br /> <br />STATE OF COLORI\DO <br /> <br />(8 <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Go'vernor <br /> <br />TO: <br /> <br />James S. Lochhead <br />Executive Director, DNR <br />DariesC. Lile, P.E. <br />Director, eweB <br />Peter H. Evans <br />Acting Director, eWeB <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />Bill Stanton, P.E., Chief, Project Planning and Construction Section, and <br />John Van Sciver <br /> <br />DATE: <br /> <br />September 14, 1 998 <br /> <br />SUBJECT: <br /> <br />Agenda Item 16c.. Sept. 21-22.1998, Board Meeting-- <br />Marketing Update on Future Prospects for 1998...lInformationalltem) <br /> <br />Table (1): Applications Received in 1998, to Date <br />Table (2): Additional Prospects for 1998 <br /> <br />TABLE (1) APPLICATIONS RECEIVED IN 1998. TO DATE <br />BORROWER PROJECT DESCRIPTION AMOUNT <br />Boulder and Left Hand Rehabilitate Twin Lakes outlet, and replace drop $50K <br />Irrigation Co. structures on the ditch. $62.5K total project <br />(Boulder Co.) cost. <br />Small Project Loan Approved 3/10/98, <br />Columbine Ranches Purchase water rights to augment an existing $300K <br />POA irrigation well, and rehabilitate the well pump <br />(Adams Co.) and motor. $401 K total project cost. <br /> Scheduled for consideration' November 1998: <br />Dolores Water Conduct a feasibility study to investigate $75K <br />Conservancy District development of additional water supplies. <br />(Dolores and $150K total study cost. <br />Montezuma Co.) <br />Feasibility Loan Approved 7/1 3/98 <br />Farmers Pawnee Canal Rehabilitate diversion structure and headgate on $29K <br />(Morgan Co.) the South Platte River. $11 OK total project cost. <br />Small Project Loan Approved 3/10/98. <br />Greeley and Loveland Rehabilitate the main outlet on the Horseshoe $75K <br />Irrigation District #2 Reservoir. $100K total project cost. <br />(Larimer Co.) <br />Small Project Loan Approved 7/14/98 <br />