My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02104
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:58 PM
Creation date
10/4/2006 7:10:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/20/2000
Description
WSP Section - Colorado River Basin Issues - Animas-La Plata Project Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />.J <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (3D3) 866-3441 <br />FAX, (303) 866-4474 <br /> <br />Q <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Greg E.Walchcr <br />Executive Director <br /> <br />FROM: <br /> <br />Randy Seaholm <br />Chief, Interstate Streams Investigations <br /> <br />Peler H. Evans <br />eweB Din'ctor <br /> <br />DATE: <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />March 10, 2000 <br /> <br />SUBJECT: Agenda Item 23h, March 20-21, 2000 Board Meeting- <br />Colorado River Basin Issues - Animas-La Plata Project Status Report <br /> <br />Backl!round <br /> <br />At the January Board meeting, the Board asked staffto review ~he status and schedule of <br />actions that need to be completed prior to initiating actual construction of the Animas-La <br />Plata Project (ALP), <br /> <br />Discussion <br /> <br />We have reviewed with Reclamation the actions that need to occur prior to start of <br />construction on ALP, The following general activities and schedule are currently <br />envisioned, <br /> <br />April 17.2000 <br />-June 23. 2000 <br />-July 23. 2000 <br />-July 23. 2000-01 <br />-July 2001-02 <br />-July 2002 <br /> <br />DSElS comment period closes <br />Send FSEIS to EPA <br />Reclamation issues Record of Decision <br />Develop final design specifications, obtain permits, contracts, etc, <br />Release documents for bid and contractor selection <br />Start earth work construction <br /> <br />Assuming we obtain a favorable "Record of Decision" through the ElS process, the <br />Board then needs to focus attention on the following activities between that point and the <br />release of the bid documents in July 200 I, <br /> <br />I, Get the legislation amending the 1988 Colorado Ute Indian Water Rights Settlement <br />Agreement passed, Representative Scott McInnis has introduced H,R, 3112 to <br />accomplish this purpose, This includes resolving any project water allocation <br />differences between the preferred alternative in the "Record of Decision" and the <br />legislation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.