My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02074
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:55 PM
Creation date
10/4/2006 7:09:05 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/15/2005
Description
CF Section - Estimate of Funds Available for New Projects in 2006 - CWCB Construction Fund - Loans and Non-Reimbursable Investments
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />STATE OF COLORADO <br /> <br />e Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.llS <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />Russell George <br />Executive Director <br /> <br />MEMORANDUM <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Mike Serlet, p.E.:'#lJ r <br />Chief, Water Suppf~ing and Finance Section <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />FROM: <br /> <br />DATE: <br /> <br />November 8, 2005 <br /> <br />e <br /> <br />SUBJECT: <br /> <br />Agenda Item 22a, November 15-16, 2005 Board Meeting <br />Water Supply Planning and Finance <br />Estimate of Funds Available for New Projects in 2006 <br />CWCB Construction Fund - Loans and Non-Reimbursable Investments <br /> <br />Introduction <br />This financial information is for the Board's use in evaluating the availability of additional <br />funds from the Construction Fund for new loans to finance future water projects and for other non- <br />reimbursable investments. <br /> <br />Background <br />The information for the CWCB Construction Fund is based on the closing reports for the <br />fiscal year ended June 30, 2005. A total of approximately $68.2 million is projected as available for <br />modifications to previous loan authorizations and new construction project loans. <br /> <br />e <br /> <br />Discussion <br />Attached is a financial projection surnmanzmg the FY2005-06 Construction Fund cash <br />available and projected expenses. Total revenue available for new projects and other expenses is <br />$68.2 million, projected expenses are $10 million, leaving a projected balance of$58.2 million. This <br />number includes loan and. non-reimbursable investment projects presented at the November Board <br />meeting. <br /> <br />Flood Protection. Water Supply PlaMing and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.