My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02039
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:24 PM
Creation date
10/4/2006 7:08:30 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/20/2004
Description
CF Section - New Loans - Pinewood Springs Water District - New Reservoir and Raw Water Pipeline Construction and Water Rights Purchase
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303)866-3441 <br />FAX: (303) 866-4474 <br />www,cwcb.state.co_us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Bruce Johnson, P.E. f&,~' <br />Mike Serlet, P.E., Chjef~.lj <br />Water Supply Planning andiFiilance Section <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />eWeB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: <br /> <br />July 9, 2004 <br /> <br />SUBJECT: Agenda Item 14e, July 20-21, 2004 Board Meeting <br />Water Supply Planning and Finance Section - New Loans <br />Pinewood Springs Water District - New Reservoir and Raw Water <br />Pipeline Construction and Water Rights Purchase <br /> <br />Introduction <br /> <br />The Pinewood Springs Water District (PSWD) is applying for a $2,033,850 loan from the Severance <br />Tax Trust Fund Perpetual Base Account to construct a new storage reservoir, pump station and raw <br />water pipeline, raw water infiltration gallery modifications, and to purchase additional water rights. The <br />estimated total cost of the raw water portion of the project is $2,711,805. The project is part of a larger <br />Drought Mitigation Project (DMP), that also includes expanding the existing water treatment facility and <br />replacing distribution lines. The total project cost is $3,109,100, Please see the attached project <br />summary and map. <br /> <br />Backaround <br /> <br />PSWD is located approximately 11 miles east of Estes Park, and encompasses approximately 700 <br />acres. They provide water to 268 taps (266 households and two businesses) with a projected total <br />of 350 taps at pianned build-out (estimated to occur in 2015). PSWD draws surface water from the <br />Little Thompson River and processes this water for domestic consumption with a micro-filtration <br />plant. The distribution system consists of four (4) storage tanks with a total capacity of 1.2 million <br />gallons of treated water, and approximately 10 miles of pipeline and four (4) pumping facilities, <br />There are 3 pressure zones in the system to cover an elevation range of 600 feet. PSWD has no <br />raw water storage. They also have several wells that have been used in the past, but are now <br />taken off line due to low capacity and high operating expense, <br /> <br />PSWD has been severely impacted by water shortage during the past several years. In July 2000, <br />the Little Thompson River, the primary source of water, ran dry as a result of severe drought <br />conditions. In 2001 PSWD spent $123,017 to haul water purchased from the City of Longmont, <br />and in 2002 spent $59,174 for hauled water. The persistent nature of the drought over the last <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Plamting <br />
The URL can be used to link to this page
Your browser does not support the video tag.