My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02013
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:59 PM
Creation date
10/4/2006 7:06:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/20/2000
Description
CF Section - Julesburg Irrigation District - Peterson Ditch Control Structures and Request for Loan Refinancing
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />, <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natura! Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) S66,3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.u5 <br /> <br />Q <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />John Van SCiver, P.~!(S <br />Mike Serlet, P.E., Chief <br />Water Supply Planning no Finance Section. <br /> <br />Dan McAuliffe <br />Acting Director <br /> <br />DATE: November 8,2000 <br /> <br />SUBJECT: Agenda Items 14b. and 15a., November 20-21, 2000 Board Meeting <br />Julesburg Irrigation District - Peterson Ditch Control Structures and <br />Request for Loan Refinancing. <br /> <br />Introduction <br />The Julesburg Irrigation District (JID) is applying for a $100,000 Small Project Loan to reconstruct <br />the Peterson Ditch Control structures on Lodgepole Creek, The estimated total cost of the project <br />is $145,000. Please see the attached project summary and map. <br /> <br />BackQround <br />The JID, located in Sedgwick County, operates the Peterson Ditch for the benefit of the <br />shareholders to deliver direct flow and storage irrigation water. (The District also operates the <br />Settlers Ditch, the Highline Ditch, the Harmony Ditch #1 , and the Julesburg Reservoir.) <br /> <br />The Peterson Ditch diverts from the South Platte River, 2 miles west of Sedgwick. Direct flows of <br />the Peterson, along with Julesburg Reservoir storage water, are delivered through the system to <br />irrigate 7840-acres, The Peterson Ditch crosses Lodgepole Creek about 2 miles north of Ovid, <br />and the control structures at this location are in poor condition, The downstream end of the <br />spillway drop structure has been undercut and could fail during a flood. This would release the <br />entire ditch flow to Lodgepole Creek and cause flooding downstream. The JID needs to rebuild <br />the diversion as soon as possible, preferably in winter-spring 2001. prior to the irrigation season. <br />The District is eligible for a loan from the Small Project Loan Account, since delaying construction <br />until summer or fall 2001 would result in a hardship on the Borrower. The current condition of the <br />drop structure makes it dangerous to operate. <br /> <br />The JID has two existing loans with the CWCB. As part of this loan application, the district is <br />requesting that one of those loans (Julesburg Reservoir Rehabilitation, $372,950, 40 years,5%) <br />be refinanced to a 30-year loan at 4%; standard terms for a CWCB agricultural loan in 2000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.