Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.u5 <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Colorado Water Conservation Board Members <br /> <br />Bruce Johnson, P.E. ~~liin' ' <br />Mike Serlet, P.E., Chief <br />Water Supply Planning inance Section <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />FROM: <br /> <br />DATE: <br /> <br />August30,2002 <br /> <br />SUBJECT: Agenda Item 12e, September 11-12, 2002 Board Meeting <br />Water Supply Planning and Finance Section - New Loans <br />Lorna Ditch and Lateral Company - Ditch Rehabilitation <br /> <br />Introduction <br /> <br />The Loma Ditch and Lateral Company (LDLC) is applying for a $250,235 Small Project Loan from the <br />Construction Fund to rehabilitate their existing open concrete ditch by placing it in an underground <br />pipe. The estimated total cost of the project is $278,041. This project is a continuation of an earlier <br />project begun in 2000 which placed approximately half of the existing ditch in underground pipe. <br />Please see the attached project summary and map. <br /> <br />Backaround <br /> <br />The LDLC is located in Mesa County near the community of Loma, approximately 15 miles <br />northwest of Grand Junction. It operates for the benefit of its shareholders by delivering water for <br />irrigation within an 800-acre service area. The ditch is a carrier ditch for irrigation water from head <br />gate 345 of the Keiffer Extension of the Grand Valley Irrigation Company (GVIC). It extends <br />approximately 3.2 miles from the GVIC head gate to the end of the ditch/lateral. The upper portion. <br />of the lateral (1.7 miles) has been converted from open concrete ditch to underground pipe in two <br />phases beginning in 2000 and completed in Spring 2002. The previous project was paid for by a <br />combination of Natural Resources Conservation Service (NRCS) funds and shareholder special <br />assessments. The remaining portion of the ditch (1.5 miles), being addressed by this application, <br />remains in open concrete ditch and is in badly deteriorated condition. Portions of the existing open <br />concrete ditch are cracked and broken to the point of leaking, seeping, and occasionally flooding in <br />many places. The LDLC is proposing to upgrade the remaining deteriorated section of the service <br />by completing installation of underground pipeline (18" to 1 0") to complete the project. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />