My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01756
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:39 PM
Creation date
10/4/2006 7:01:54 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
ISF Section - Instream Flow Appropriations - Wildcat Gulch
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Stream: Wi Idcat Gulch <br /> <br />Executive Summary <br /> <br />Water Division: 2 <br />Water District: 11 <br />CDOW#: 31334 <br />CWCB ID#: 04/2/A - 011 <br /> <br />SeQment: Headwaters to Chalk Creek <br />Upper Terminus: Headwaters <br />(Latitude 380 40' 04"N) (Longitude 106025' 31"W) <br />UTM ~ 42 80 668N 13 3 76 002E <br /> <br />Lower Terminus: Chalk Creek <br />(Latitude 380 40' 12"N) (Longitude 106022' 26"W) <br />UTM ~ 42 80 843N 13 3 80 477E <br /> <br />Watershed: Arkansas Headwaters (HUC: 11020001) <br />Counties: Chaffee County <br />Length: 2.9 miles <br />USGS Quad(s): Cumberland Pass, St. Elmo <br />Flow Recommendation: 4.20 cfs (May 15'h - July 31 e') <br />2.90 cfs (August 1 e' - August 31 e') <br />1.35 cfs (September 1 e' - October 31 e') <br />0.55 cfs (November 1 e' - May 14th) <br /> <br /> <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.