My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01338
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:00:42 PM
Creation date
10/4/2006 6:53:30 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
Flood Section - Platte River Basin Issues - Chatfield Storage Space Reallocation - Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P"'z <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 3 1 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866-3441 <br />FAX: (3031 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />Peter H. Evans <br />Acting Director, CWCB <br /> <br />TO: Colorado Water Conservation Board <br /> <br />FROM: Larry F. Lang <br /> <br />DATE: January 19, 1999 <br /> <br />SUBJECT: Agenda Item lSd, January 27-28, 1999 Board Meeting- <br />Chatfield Storage Space Reallocation - Status Report <br /> <br />INTRODUCTION <br />This memo will provide the Board with a progress report on the Chatfield Storage Space <br />Reallocation Study. The US Army Corps of Engineers, Chatfield Study Group, and CWCB staff <br />have been working very effectively on the completion of the RecOlmaissance Study and <br />development of the Feasibility Study Project study plan. <br /> <br />The Bo.ard will recall that the Board staff, in cooperation with the Corps of Engineers, conducted <br />a public hearing regarding expectations on Chatfield Reservoir issues. These issues ranged in <br />scope from downstream flooding because of certain release operations from the outlet works, to <br />better management of storage pools within the reservoir. Much interest was expressed regarding <br />the need for better reservoir operations during floods, the need for water supply storage for <br />municipal and agricultural communities, impacts on the existing recreational facilities, the <br />impact to the environment, and habitat concerns. <br /> <br />Following the hearing, a formal request was made to the Corps of Engineers to fund a <br />reconnaissance level study to determine what level of study investigation will best address the <br />basin needs and interests. Funding was secured for the reconnaissance study in December 1997 <br />by the Corps, in the amount of$IOO,OOO. <br /> <br />SECTION 905(b) RECONNAISSANCE STUDY <br />The Corps of Engineers, Omaha District, in cooperation with the CWCB and its Chatfield Study <br />Group completed the Chatfield Reconnaissance Study in the fall of 1998. The major tasks of the <br />reconnaissance study were the development of a "Project Study Plan" and execution of a <br />"Feasibility Cost Sharing Agreement." <br /> <br />The study recommends that there is a need to evaluate the feasibility for the development of <br />water supply in the existing Chatfield Reservoir. The study further recommended that the Corps <br />of Engineers seek authorization and funding for a feasibility study. By letter dated June 22, <br />
The URL can be used to link to this page
Your browser does not support the video tag.