My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00125
CWCB
>
Publications
>
Backfile
>
PUB00125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:21:06 PM
Metadata
Fields
Template:
Publications
Year
1997
Title
Report on Ground Water Recharge and Mangement Project Rio Grande Basin, Colorado
CWCB Section
Finance
Author
Davis Engineering Service, Inc.
Description
Data for understanding mechanism of ground water recharge in the San Luis Valley & construct major recharge structure to facilitate ground water storage with winter surface diverersion
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />San Luis Valley Water Conservancy District <br />835 First Avenue <br />P. O. Box 729 <br />Monte Vista, CO 81144 <br />Telephone: (719) 852-2315 <br />Fax: (719) 852-0280 <br /> <br />7 <br />RECEIVED <br />~~~;'~~o;~~7 <br /> <br />Carol Redding, Manager <br /> <br />November 24,1997 <br /> <br /> <br /> <br />, <br /> <br /> <br />Mr. e Ser1et, P.E. <br />Color do Water Conservation Board <br />721 State Centennial Building <br />1313 Shennan Street <br />Denver, CO 80203 <br /> <br /> <br />C('JJJ"" <br />~ <br />~ <br /> <br />1 <br />~ <br />j <br /> <br />d Wate e and Management Project <br />Contract Encumbrance No. C153626 <br /> <br />Dear Mr. Serlet: <br /> <br />Enclosed please find a draft .copy of the Report on Ground Water Recharge and <br />Management Project - Rio Grande Busin, Colorado prepared by Allen Davey, Davis Engineering <br />Service, Inc. in partial fulfillment of the CWCB grant requirements. <br /> <br />This project was initiated by the San Luis Valley Water Conservancy District for the purpose <br />of collecting data that would provide a better understanding of the benefits of ground water recharge <br />in the San Luis Valley of Colorado and construct a major recharge structure to facilitate ground <br />water storage with winter surface diversions. <br /> <br />You will recall that the District received several extensions oftime on this project. I believe <br />that the project is now complete and I will be requesting reimbursement of funds in the very near <br />future. Please review Allen's report and if you have any comments or concerns, please give Allen <br />a call. He will then incorporate any changes and submit it final report. <br /> <br />If you have any questions, please give me a call. My office hours are usually on Mondays <br />and Wednesdays. Thanks for your help and patience. <br /> <br />Since <br /> <br /> <br />~ Redding, <br /> <br /> <br />, <br /> <br />r <br /> <br />cr <br />enc. <br />xc: Allen Davey <br />Keith Holland, President, Center, CO; Doug Gunnels, Vice Presiden~ Center, CO; Eric Ellithorpe, Secretaryrrreasurer, Monte <br />Vista, CO; Directors: Gerald A. Ziegler, Alamosa, CO ; Charles A. Lavery, Alamosa, CO; Robert Felmlee, Center, CO; Doug <br />Messick, Monte Vista, CO; Mike Prentice, Monte Vista, CO; Pams Bervig, Alamosa, CO; Athie Daniels, South Fork, Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.