My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ft Collins Soil Amendment Contract
CWCB
>
Water Conservation
>
Backfile
>
Ft Collins Soil Amendment Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:00:07 PM
Creation date
9/30/2006 9:02:01 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153628
Applicant
City of Fort Collins
Project Name
Composted Manure Soil Amendment
Title
Contract
Date
8/28/1992
County
Larimer
Water Conservation - Doc Type
Contract
Document Relationships
Ft Collins Soil Amendment Applic
(Message)
Path:
\Water Conservation\Backfile
Ft Collins Soil Amendment Approval Letter
(Message)
Path:
\Water Conservation\Backfile
Ft Collins Soil Amendment Final Report
(Message)
Path:
\Water Conservation\Backfile
Ft Collins Soil Amendment WorkPlan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />D PAR1MENT OR AGENCY <br /> <br /> <br />CONTRACT ROUTING NUMBER <br /> <br /> <br />y <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this 28th day of August 1992, by and between the State of Colorado for the use and benefit of the Department of Natural <br />Resources, Colorado Water Conservation Board, 1313 Sherman St. Room 721, Denver, Colorado 80203 hereinafter referred to as the State, and City of Fort <br />Collins, P.O. Box 580, Fort Collins. Colorado, 80522, hereinafter referred to as the Contractor. <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient unencumbered <br />balance there of remains available for payment in Agency PDA, Fund Number 424, Organization 92YY, Appropriation Code 100, Program WTRe, Object Code <br />5110, Sub Object Code 11 Contract Encumbrance Numbe-;-r- \ 5.3 b). i ~nd - -- <br /> <br />WHEREAS. required approval, clearance and coordination has been accomplished from and with appropriate agencies; and <br /> <br />WHEREAS, the State desires to assist public agencies, established under Colorado law, for the purpose of a pilot program demonstrating the <br />benefits of water efficiency measures by providing incentive grants pursu8Jlt to the authority granted in Section 37-60-125, CRS; and <br /> <br />WHEREAS, the Contractor's application for a grant from the Water Conservation Board Construction Fund has been received and approved by <br />the Colorado Water Conservation Board; and <br /> <br />WHEREAS, the Colorado Water Conservation Board desires to distribute said funds pursuant to law; and <br /> <br />WHEREAS, the Contractor is an eligible public agency to receive grant assistance from the Pilot Program for demonstrating the benefits of water <br />efficiency measures. <br /> <br />NOW THEREFORE it is hereby agreed that: <br /> <br />1. Area Covered. The Contractor shall perform and accomplish all the necessary work and services provided under this Contract, as described <br />in the attached Exhibit A, which is incoqx>rated herein and made part of this Contract by reference. <br /> <br />2. Scope of Services. In consideration for the monies to be received from the State, the Contractor shall do, perform, and carry out, in a <br />satisfactory and proper manner, as determined by the State, all work elements as indicated in the "Scope of Services", set forth in the attached Exhibit A, <br />hereinafter referred to as the "Project" and incorporated herein. Work performed prior to the execution of this Contract shall not be considered part ofthis Project. <br /> <br />3. ResDOnsible Administrator. The performance of the services required hereunder shall be under the direct supervision of Jim Oark, an employee <br />or agent of Contractor, who is hereby designated as the administrator-in-charge of this Project. If At any time the administrator-in-charge changes the Board must <br />be given written notice of the change and must approve the replacement before any further monies are distributed. <br /> <br />4. Time of Performance. This Contract shall become effective upon proper execution of this Contract by the State Controller or his designee. <br />The Project contemplated herein shall commence as soon as practicable after the execution of this Contract and shall be undertaken and performed in the sequence <br />set forth in the "Time of Performance" in the attached Exhibit A. Expenses incurred by the Contractor in association with said Project prior to execution of this <br />Contract shall not be eligible expenditures. The Contractor agrees that time is of the essence in the performance of its obligations under this Contract, and that <br />completion of the Project shall occur no later chan che termination date set forth in che Time of Performance in Exhibit A. <br /> <br />5. Compensation and Method of Payment. The State agrees to pay to the Contractor, in consideration for the work and services to be performed, <br />a total amount not to exceed TEN TIlOUSAND DOLLARS AND NO/lOO ( $10.000). The method and time of payment shall be made in accordance with the <br />"Payment Schedule" set forth in Exhibit A. <br /> <br />Page 1 of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.