My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-020 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-020 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 8:55:53 AM
Creation date
1/3/2017 8:55:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-020
C150380
Contractor Name
Consolidated Home Supply Ditch and Reservoir Company
Contract Type
Loan
County
Larimer
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4COLORADO Emergency George Rist Ditch Repair <br /> co -. Colorado Water <br /> Conservation Board Consolidated Home Supply Ditch and Reservoir Company <br /> Project Closeout January 1, 2017 <br /> n L _ <br /> '�• f- fit' r .d~ <br /> t- r . <br /> • <br /> •ai <br /> it <br /> r e M s'`.. `.z N M :: ..x •..T1MM - d I F 1 <br /> '�. <br /> f• Vwt <br /> • <br /> 011F- <br /> .°1441911V <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged including <br /> the Company's George Rist ditch and diversion structure. During the flood, the diversion dam, <br /> headgate, measuring flume, stilling well and house, and access road was heavily damaged. <br /> Additionally, two sections of ditch embankment were completely washed out. The Project included <br /> cleaning debris and silt out of the diversion dam and headgates, reconstruction of the measuring flume <br /> and stilling well, and reconstruction of the diversion structure access road. The two sections of ditch <br /> embankment that were breached were restored with compacted material and erosion protection <br /> measures <br /> PROJECT DATA <br /> Sponsor: Consolidated Home County: Larimer Water Source: Big Thompson <br /> Supply Ditch & Res. Co. River <br /> Type of Loan: Diversion Rehabilitation Board Approval Date: October 2013 <br /> Terms of Loan: (Original) $519,140 at 1.95% for 30 years (Disbursed) $491,111.77 <br /> Design Engineer: Deere & Ault Consultants <br /> Contractor: Gerrard Excavating <br /> Project Elements: Diversion dam and headgate repair; parshall flume, ditch embankment rebuild <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.