Laserfiche WebLink
* DHR ; COLORADO Mt. Pisgah Dam/Wrights Reservoir <br /> COColorado Water <br /> Conservation Board Outlet Works Rehabilitation Project <br /> Pisgah Reservoir and Ditch Company <br /> Substantially Complete October 1, 2016 <br /> f <br /> • <br /> 'l,V f• r <br /> v.�.:`".,, ...,.. _�.. �+.' <br /> 00, <br /> r Rte. s 5 <br /> �.p d ,Fr'..., ,1 <br /> a Via' >}�# +,y ,„ ,, ' lb4'',. e•i' <br /> Project Description <br /> The Pisgah Reservoir and Ditch Company received a CWCB Loan and a $161,345 WSRF grant to rehabilitate <br /> Pisgah Dam at Wrights Reservoir per the State Engineer's Office direction. The Project goal was to improve <br /> the safety and operation of the dam's low level outlet works and properly abandon the dam's original <br /> outlet conduits. Phase 1 was to properly abandon the old outlet works by injecting the old conduit with <br /> grout. Phase 2 was the installation of an upstream gate to allow for an unpressurized outlet when closed. <br /> Phase 3 was the replacement of the outlet works including gate valves, operators, and stems; new <br /> hydraulic controls and piping; replacing the access ladder and valve operator building; and concrete tunnel <br /> repairs. Phases 2 and 3 were successfully completed. The success of Phase 1 has yet to be determined and <br /> the Company plans on additional engineering and monitoring to determine if additional mitigation work is <br /> needed. Future work on Phase 1 will be completed with Company funds unless Project costs greatly <br /> exceed current estimates, thus necessitating a new loan. <br /> PROJECT DATA <br /> Sponsor: Pisgah Reservoir and County: Teller Water Source: Fourmile Creek <br /> Ditch Company <br /> Type of Loan: Reservoir Rehabilitation Board Approval Date: September 2012 <br /> Terms of Loan: $1,172,261 at 1.75% for 30 years (Original) 990,176.11 (Final) <br /> Design Engineer: RJH Consultants, Inc. <br /> Contractor: Inland Potable Services, Inc. <br /> Project Elements: Grouting of (2) 16” dia pipe, 30"x30" sluice gate (underwater construction), (2) <br /> 24" knife gate, tunnel grout repairs, hydraulic control piping, valve house construction. <br /> Water Project Loan Program - Project Summary <br />