My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-070 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-070 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 2:06:11 PM
Creation date
7/8/2016 2:06:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-070
C150353
Contractor Name
Boxelder Basin Regional Stormwater Authority
Contract Type
Loan
County
Larimer
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' D4 COLORADO East Side Detention Facility <br /> co Colorado Water <br /> Conservation Board Boxelder Basin Regional Stormwater Authority <br /> Substantially Complete July 1, 2016 <br /> r <br /> .11111.11111111111_ <br /> • Box Culvert Under Construction Completed Box Culvert , <br /> iiiiEmergency Spillway 41114 <br /> 1" - .a <br /> CR-50 <br /> • • i -iii . ` K <br /> • • , max. <br /> CR-50 Boxelder Creek <br /> fi -�� -- — - <br /> t 1a <br /> , <br /> Top of Dam . <br /> Project Description <br /> The Boxelder Basin Regional Stormwater Authority was formed in 2008, through an IGA between the City of <br /> Fort Collins, Larimer County and the Town of Wellington, to facilitate the construction of regional stormwater <br /> improvements to reduce the threat of flooding and remove areas from the FEMA floodplain in the Boxelder <br /> Creek basin. The East Side Detention Facility is a key component in the Authority's master plan. The <br /> detention facility provides 1,800 AF of detention storage and will decrease downstream flows from <br /> approximately 6,700 cfs to 2,400 cfs. The reduced flow rate will allow 100-year flows to be contained in the <br /> current cross-section of Boxelder Creek and will eliminate the flow that occurs in the 100-year flood plain <br /> below the proposed detention facility. Due to the location of and inherent integration required with the <br /> authority's adjacent Country Road 52 project, this project was joined with the Country Road 52 project for one <br /> construction contract. Construction commenced in August 2015 and was Substantially Completed in July 2016. <br /> PROJECT DATA <br /> Sponsor: Boxelder Basin County: Larimer Water Source: Boxelder Creek <br /> Regional Stormwater Authority <br /> Type of Loan: Flood Control Board Approval Date: May 2013 <br /> Terms of Loan: $7,171,000 at 3.0% for 15 years <br /> Design Engineer: Ayres Associates <br /> Contractor: Dietzler Construction Corporation <br /> Project Elements: -9,000 LF Flood Control Dam (1,800 AF Capacity), 425 LF of a 17'5"x6' Box Culvert <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.