Laserfiche WebLink
THE GUNNISON TUNNEL PROJECT <br /> The Uncompahgre Valley Water Users Association <br /> 601 North Park Ave. *P.O.Box 69'Montrose,CO 81402.0069 <br /> Phone: 970-249-3813 Fax:970-249-6830 <br /> November 16,2015 <br /> Peg Masan. Contract Manager <br /> DNR, CWCB <br /> 1313 Sherman St.. Room 718 <br /> Denver. CO 80203 <br /> RE: Loan Contract 2015-74 <br /> Peg. <br /> Uncompahgre Valley Water Users Association approves the change to <br /> CWCB Loan Contract 2015-174,Appendix 1 ,to include a new Section <br /> 8,titled Additional Provision.The Additional Provision language is as <br /> follows: <br /> The permitted use of the proceeds of the loan shall be the furnishment <br /> of such proceeds to an entity owned by the Borrower, and whose sole <br /> purpose is to perform all obligations of Borrower under the Loan <br /> Contract so long as: (a) ownership of the entity shall fully be vested in <br /> the Borrower; (b)the sole purpose and, therefore, the only permitted <br /> activities of the entity shall be consistent with the Loan Contract; and <br /> (c)so long as Borrower continues, without interruption,to perform all <br /> its duties, obligations and responsibilities under the Loan Contract. <br /> Additionally, removal of the reference to the Shareholders' Resolution <br /> in the Loan Contract, Paragraph A.6., Page 3, which is not required, is <br /> approved. <br /> Sincerely. <br /> George Etchart <br /> President,Board of Directors <br /> Uncompahgre Valley Water <br /> Users Association(UVWUA) <br />