My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-169 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-169 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 3:12:00 PM
Creation date
4/28/2015 3:16:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-169
Contractor Name
West Reservoir and Ditch Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER:WEST RESERVOIR AND DITCH AGENCY NAME: COLORADO WATER <br /> COMPANY CONSERVATION BOARD/PDA <br /> REQUESTED LOAN AMOUNT: $245,919 CONTRACT TYPE: LOAN/PRIVATE <br /> LOAN ORIGINATION FEE: $2,459 CWCB CMS: 74840/CORE: CT2015-169 <br /> TOTAL LOAN AMOUNT: $248,378 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT-WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT is made between the State of Colorado for the use and benefit of <br /> The Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "State"), and West Reservoir and Ditch Company, 37200 Stucker Mesa, Hotchkiss, <br /> Colorado, 81419 ("BORROWER"), a Colorado nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On November 20, 2014, the CWCB approved a loan request from the BORROWER for <br /> the Repair of West Reservoir No.1 Outlet Works ("PROJECT") due to deterioration of <br /> the outlet works conduit, which will be replaced and improvements made. The total <br /> estimated project cost is $471,577. The BORROWER was also approved for a WSRA <br /> Grant with a total amount of $225,658. The total loan amount of $248,378, which <br /> includes a one percent (1%) loan origination fee of$2,459, is payable over 30 years at <br /> an interest rate of 2.00%; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval and Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Origination Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a loan origination fee of one percent (1%) of the PROJECT amount. In the event that <br /> the BORROWER does not use the full LOAN AMOUNT authorized, the parties shall <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.