My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150290 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150290 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:19:09 PM
Creation date
2/26/2015 11:17:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-030
C150290
Contractor Name
Joseph W. Bowles Reservoir Company
Contract Type
Loan
County
Jefferson
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Co CO o Lao RtA D O Bowles No. 1' Dam Rehabilitation Project <br /> Conservation Board Joseph Bowles Reservoir Company <br /> Substantially Complete March 2015 <br /> y <br /> r w. <br /> 3 1 `4,:;"'o .. 'L a f , <br /> * , "` <br /> ..� oar <br /> k„,:,... ,....,,, «� �„ t h^ O <br /> X ` . v c. <br /> Project Description <br /> The Joseph W. Bowles Reservoir Company owns and operates Bowles No. 1 Reservoir, located in the <br /> southwest metropolitan area of Denver. The Company was formed in 1906 and has 50 shareholders who <br /> use the water for municipal uses including parks, open space, and golf courses, as well as some individual <br /> ranches for irrigation water. The Project consisted of several repairs to correct dam safety deficiencies <br /> and improve the long term performance of Bowles No. 1 Dam. Dam repairs included the widening the dam <br /> crest, reconstructing the upstream slope, installing a seepage collection and toe drain system on the <br /> downstream slope, and lining the existing dam outlet pipe. Additionally, the Project rehabilitated a <br /> section of the reservoir's inlet ditch. This work included piping a section of the open ditch, reconstructing <br /> the ditch alignment, placing slope protection in high erosion areas, and installing a flow control pipe that <br /> will provide for the safe discharge of excessive ditch flows into an existing spillway and drainage structure. <br /> This was a long term Project with many phases which saw some level of construction occurring from fall of <br /> 2010 to fall of 2014. <br /> P R O J E C T D A T A <br /> Sponsor: Joseph W. Bowles County: Jefferson Water Source: Bear Creek <br /> Reservoir Company <br /> Type of Loan: Dam Rehabilitation Board Approval Date: May 19, 2009 <br /> Terms of Loan: $1,703,870 for 30 years @ <br /> Design Engineer: W.W. Wheeler and Associates <br /> Contractor: Winslow Construction Company, Tezak Equip <br /> Project Elements: Widen dam crest, reconstruct upsteam Heavy slope,ment install toe drains, line outlet pipe, <br /> ditch erosion control, pipe open ditch. <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.