My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150324 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150324 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:27:52 PM
Creation date
11/13/2014 8:22:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150324
CT2015-037
Contractor Name
Tri-County Water Conservancy District
Contract Type
Loan
Water District
68
County
Montrose
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tri-County Water Conservancy District <br /> Ridgway Reservoir Micro-Hydro Project <br /> • <br /> 111 _. <br /> t . e <br /> x , r <br /> Project Description <br /> The District constructed a 8MW hydroelectric power generating facility at Ridgway Reservoir. <br /> The project was permitted through the "Lease of Power Privilege" process with the Bureau of <br /> Reclamation, allowing the incorporation of a hydropower facility into the existing outlet works of <br /> Ridgway Dam. The dam, constructed by the Bureau as part of the Dallas Creek Project, began <br /> storing waters of the Uncompahgre Basin in 1987. The District expects to produce 24,000 MWh <br /> annually, which will be sold to Tri-State Generation and Transmission and the City of Aspen <br /> through a Power Purchase Agreement. The District began producing power in February 2014 an d <br /> substantially completed in May 2014. <br /> Project Data <br /> Sponsor: Tri-County Water Conservancy County: Water Source: Uncompahgre River <br /> District Ouray/Montrose/Delta <br /> Terms of Loan: $13,130,000 for 30 years @ 2.0% Substantial Completion:October 1,2014 <br /> Design Engineer: Sorenson Engineering and China Huadian Engineering <br /> Contractor: Mountain States Hydro,LLC and Riverside Inc. <br /> Project Elements: 1,700 cy of concrete,interconnection switchyard,a large and a small turbine and <br /> generator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.