My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150399 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150399 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
10/6/2014 11:10:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-092
C150399
Contractor Name
Fulton Irrigationg Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: FULTON IRRIGATING DITCH AGENCY NAME: COLORADO WATER <br /> COMPANY CONSERVATION BOARD/PDA <br /> CONTRACT No. C150399 CONTRACT TYPE: LOAN/PRIVATE <br /> PROJECT COSTS: $2,007,000 CWCB CMS: 71396/CORE: CT2015-092 <br /> LOAN SERVICE FEE: $20,070 <br /> LOAN AMOUNT: $2,027,070 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT-WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT is made between the State of Colorado for the use and benefit of <br /> The Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "State"), and Fulton Irrigating Ditch Company, 25 South 4th Ave., Brighton, CO 80601 <br /> ("BORROWER"), a Colorado nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On May 22, 2014, the CWCB approved a loan request from the BORROWER for the <br /> Diversion Structure Rehabilitation Project ("PROJECT") to minimize the occurrence of <br /> failures of the diversion structure system. The project will replace the BORROWER'S <br /> South Platte River diversion gates, rehabilitate the existing trash rack and reconstruct <br /> the Branch Ditch Diversion Structure on the Fulton Ditch. The total estimated project <br /> cost is $2,230,000. The total loan amount is $2,027,070 which includes a one percent <br /> (1%) loan origination fee of$20,070 at an interest rate of 2.45% for 30 years; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval and Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Service Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> Loan Contract C150399 <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.