Laserfiche WebLink
• <br /> AGENCY NAME: Water Conservation Board <br /> AGENCY NUMBER: PDA <br /> ROUTING NUMBER: 0 02 p,24 coo 5t <br /> LOAN CONTRACT <br /> THIS CONTRACT, made this 1st day of February 2002, by and between the State of Colorado <br /> for the use and benefit of the Department of Natural Resources, Colorado Water Conservation <br /> Board, hereinafter referred to as the CWCB and/or STATE, and Peoples Ditch Company, a Colorado <br /> nonprofit corporation, 23738 Road 40, Sterling, Colorado, 80751 hereinafter referred to as the <br /> BORROWER and/or CONTRACTOR. <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br /> available and a sufficient unencumbered balance thereof remains available for payment in Fund <br /> Number 486, Organization YYYY, Appropriation 010, GBL P049, Program WTRC, Object Code <br /> 5881, Reporting Category: 0049, Contract Encumbrance Number C150049. <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies. <br /> 3. Pursuant to the provisions of§§ 37-60-119 and 37-60-120, C.R.S. (1999) the STATE is authorized <br /> to loan money for the construction of water projects for the benefit of the people of the State, <br /> provided that the borrower assures repayment of that money. <br /> 4. The BORROWER is a duly constituted Colorado nonprofit mutual ditch company formed pursuant <br /> to and governed by Article 42 of Title 7, C.R.S., located in Logan County, State of Colorado. <br /> 5. A Small Project Loan Account was established by§ 37-60-122.7, C.R.S. (1999), which authorizes <br /> the CWCB to make loans of up to $100,000 without prior approval from the General Assembly if <br /> the CWCB determines that delay would result in undue hardship on the borrower. <br /> -- 6. The BORROWER has applied to the STATE for a Small Project Loan in the amount of$43,000 to be <br /> used to construct a pipeline to replace the Borrower's washed-out ditch and diversion structure, <br /> hereinafter referred to as PROJECT, at a total cost of$75,000. <br /> 7. The STATE has reviewed a feasibility report compiled by John Van Solver, which is incorporated <br /> herein by reference, and, based upon this feasibility report, the STATE determined the PROJECT to <br /> be technically and financially feasible. <br /> 8. At its July 2000 meeting, the CWCB approved a loan to the BORROWER in an amount up to <br /> $43,000, at an interest rate of 3.75% per annum for a repayment term of 20 years. The CWCB <br /> has determined that this loan qualifies as a Small Project Loan in accordance with § 37-60-122.7, <br /> C.R.S. (1999), and the BORROWER will suffer undue hardship if the project is not completed as <br /> soon as possible because of the inability to deliver water. <br /> 9. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br /> mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained herein, <br /> the parties agree as follows: <br /> A. The BORROWER agrees as follows: <br /> 1. Construction Fund Program Procedures. The following items are procedures the BORROWER <br /> shall follow during the construction phase of the PROJECT. <br />