Laserfiche WebLink
Culver Lateral Ditch Company <br /> Emergency Culver Mahoney Ditch Repair <br /> 150390 <br /> - - <br /> t p- ,..^1 r � r . �,yr ' <br /> ,. !� i 1 _ , <br /> y' <br /> e, <br /> T 6 <br /> ,,,,r_ q,,. <br /> end'. <br /> F <br /> A <br /> 1 <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged including the <br /> Culver Lateral Ditch Company ditch and diversion structure. The flood damaged the diversion dam, <br /> headgate structure, sand gates, measurement flume, and recording structure. Additionally, the first <br /> 1,500 feet of ditch was destroyed as it effectively became a part of the Little Thompson River. The next <br /> 1,800 feet of ditch was filled with sediment. The purpose of the Project is to repair the diversion <br /> structure and ditch to allow the Company to divert its decreed water rights. <br /> Project Data <br /> Sponsor: Culver Lateral Ditch Company County: Water Source: Little Thompson River <br /> Boulder/Larimer <br /> Terms of Loan: $151,000 for 30 years®2.30% Construction Completed: May 2014 <br /> Expended Amount: $151,000 <br /> Anticipates FEMA Funding: YES <br /> Design Engineer: TZA Water Engineers, Inc. - Lakewood, Colorado <br /> Contractor: Chaparral Construction, LLC - LaVeta, Colorado <br /> Project Elements: The project included removal of debris and silt from the ditch and diversion dam, <br /> reshaping the ditch sideslopes and flowline, and rehabilitation of the headgate structure, sand gates, <br /> measurement flume, and recording structure. <br />