My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150358 Misc Communications
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150358 Misc Communications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:47:07 PM
Creation date
5/27/2014 12:25:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150358
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO <br /> CO 1 z Division of Water Resources <br /> i Department of Natural Re:sct:rces <br /> Dam Safety Branch <br /> April 17, 2014 <br /> Henrylyn Irrigation District <br /> Mr. Rod Baumgartner, Manager <br /> P.O. Box 85 <br /> Hudson, CO 80642 <br /> Manager®henrylyn.corn <br /> VIA EMAIL <br /> When replying, please refer to: <br /> PEOSPECT Dam, DAMID 010505 <br /> Water Division 1, Water DistrictI <br /> Construction File No. C-1493H <br /> SUBJECT: Acceptance of Construction <br /> Dear Mr. Baumgartner, <br /> A final construction inspection of the subject dam was performed by John Batka of our office on <br /> January 29, 2014 to confirm that the construction of this project had been substantially and <br /> satisfactorily completed. Subsequent to the inspection, our office received a completion <br /> certification letter, "As-Constructed" drawings, and final Construction Report from Clint Brown, <br /> P.E. and Duane Smith, P.E. in accordance with Rule 10 of the State of Colorado's "Rules and <br /> Regulations for Dam Safety and Dam Construction". <br /> The project consisted of rehabilitation of the upstream slope of the dam and modifications to <br /> the outlet conduit. Based on a review of the aforementioned documents and results of the final <br /> construction inspection, the construction of this project is considered to have been <br /> satisfactorily completed and constructed in accordance with the approved plans and <br /> specifications. Therefore, this construction project is accepted for full use when water is <br /> physically and legally available. <br /> The completion of this rehabilitation project did not enlarge the reservoir or change the <br /> overall dimensions of the dam. According to our records, Prospect Reservoir Dam has a <br /> maximum height of 43.5 feet and a crest length of 5300 feet. The reservoir created by the <br /> dam has a normal storage capacity of 6368 acre-feet. <br /> The State Engineer, by providing this construction acceptance does not assume responsibility <br /> for any unsafe condition of the subject dam. The sole responsibility for the safety of this dam <br /> rests with the reservoir owner and operator, who should take every step necessary to prevent <br /> 7405 Highway 50, Salida, CO 81201 P 719.530.5536 F 719.530.5554 www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.