Laserfiche WebLink
Water Project Construction Program — Project Data <br /> Non-Reimbursable Investment <br /> Applicant: Farmers Independent Ditch Company <br /> Project Name: Water Storage Facility Feasibility Study <br /> Odenbaugh Recharge/Storage Project <br /> Project Type: Feasibility Study <br /> County: Weld Drainage Basin: South Platte <br /> Total Study Cost: $10,000 <br /> Funding Sources: CWCB and the Company <br /> Type of Applicant: Agricultural Median Household Income: N/A <br /> CWCB Funding: $5,000 Annual Water Diversions: 16,000 acre-feet <br /> The Farmers Independent Ditch Company (FIDC) has requested non-reimbursable funding in <br /> amount of $5,000 to cover up to 50% of the cost of a study to evaluate construction of new <br /> reservoir(s) to be used for groundwater recharge and for storage. The proposed Feasibility Study will <br /> include a site survey, preliminary engineering for the site and for structures, and a final engineering <br /> report. If the feasibility study finds that the project is feasible, the Company plans to apply for a loan <br /> from the CWCB for construction. <br /> (See location map on reverse) <br />