Laserfiche WebLink
Farmers Independent Ditch Company <br /> P.O.Box 1371 <br /> Greeley , Colorado 80632-1371 <br /> 9-13-2002 <br /> John Van Sciver, P.E. <br /> Colorado Water Conservation Board <br /> 1313 Sherman St . , Room 721 <br /> Denver , CO 80203 <br /> RE: Request for Feasibility Study Grant <br /> for the Farmers Independent Ditch <br /> Company <br /> Dear Mr. Van Sciver, <br /> We have submitted preliminary application for a CWCB loan to <br /> construct a new reservoir that would be owned by the Farmers <br /> Independent Ditch Company , and have hired Forrest Leaf , P.E. , <br /> to perform the required engineering. We request a grant , in a <br /> maximum amount of $5 ,000, to pay for up to 50% of the cost of the <br /> Feasibility Study for the project . The study would be in <br /> accordance with the CWCB Guidelines , and would follow the format <br /> of the Sample CWCB Feasibility Study you have provided us . <br /> The engineering scope of work and cost estimate are attached. <br /> Sincerely, <br /> Frank A. Eckhardt, Jr . , President <br /> Farmers Independent Ditch Company <br />