My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150256 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150256 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:18:00 AM
Creation date
2/26/2014 11:18:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150256
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />Feasibility of the <br />Rehabilitation of the <br />Bijou Irrigation District <br />Diversion Structure <br />Prepared by: <br />�� <br />� � � <br />Nation <br />Engineering <br />Services�LL.c <br />June 2007 <br />FEASIBIiI'f'Y STUDY APPROVAL <br />Pursuant to Colorado Revisad Staiutes 37-60-121 8122, and <br />in accorclance with pol'rcie�s aciopted by the Board, the <br />CWCB staff has determined this Faasibility S�dy meets all <br />applicable requirements for approval, <br />4 Jq �p-�. <br />Signed Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.