My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150357 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150357 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 2:51:53 PM
Creation date
1/14/2014 10:41:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150357
Contractor Name
Boulder and Left Hand Irrigation Company
Contract Type
Loan
Water District
6
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTRACT AMENDMENT <br /> Amendment Original Loan Contract#C150357 Amendment CMS #66741 <br /> No.1 Original CMS #62283 <br /> 1) PARTIES <br /> This Amendment No.2 (AMENDMENT) to the above-referenced ORIGINAL LOAN CONTRACT (hereinafter <br /> called the ORIGINAL CONTRACT) is entered into by and between Boulder& Left Hand Irrigation <br /> Company, 157 Baylor Way, Longmont, CO 80503, ("BORROWER"), a Colorado nonprofit corporation <br /> and the STATE OF COLORADO (hereinafter called the "STATE") acting by and through the <br /> Department of Natural Resources, Colorado Water Conservation Board, (hereinafter called <br /> "CWCB"). <br /> 2) EFFECTIVE DATE AND ENFORCEABILITY <br /> This AMENDMENT shall not be effective or enforceable until it is approved and signed by the <br /> Colorado State Controller or designee (hereinafter called the "EFFECTIVE DATE"), but shall be <br /> effective and enforceable thereafter in accordance with its provisions. <br /> 3) FACTUAL RECITALS <br /> The Boulder& Left Hand Irrigation Company requested an increase to its existing CWCB LOAN <br /> CONTRACT NUMBER C150357 for the Tracy Lateral Pipeline at the Wederquist "Y" Project (PROJECT). <br /> The purpose of the PROJECT is to improve the hydraulic efficiency of the ditch while reducing the <br /> BORROWER'S operation and maintenance costs. The BORROWER'S anticipated contractor bids, based <br /> on preliminary engineering and the engineer's opinion of probable cost, came in higher than the <br /> original projected estimates. The original PROJECT COST is increasing from $175,000 to $223,500. <br /> This AMENDMENT increases the existing CWCB loan amount by $42,925, from $159,075 to <br /> $202,000. At its March 19, 2014 meeting, the CWCB approved the increase to the Loan Contract <br /> Amount. <br /> 4) CONSIDERATION <br /> Consideration for this AMENDMENT to the ORIGINAL CONTRACT consists of the payments that shall be <br /> made pursuant to this AMENDMENT and ORIGINAL CONTRACT and the promises and agreements herein <br /> set forth. <br /> 5) LIMITS OF EFFECT <br /> This AMENDMENT iS incorporated by reference into the ORIGINAL CONTRACT, and the ORIGINAL <br /> CONTRACT and all prior amendments thereto, if any, remain in full force and effect except as <br /> specifically modified herein. <br /> 6) MODIFICATIONS. <br /> The ORIGINAL CONTRACT No. C150357 and all prior amendments thereto, if any, are modified as <br /> follows: <br /> a) Amend this contract to increase the total loan amount by $42,925 increasing the LOAN <br /> CONTRACT total amount from $159,075 to $202,000. The terms for the additional loan amount <br /> remain the same as the original contract; an interest rate of 2.35% per annum and a repayment <br /> period of 30 years. A loan service fee of 1% is included in the additional loan amount in <br /> accordance with CWCB Policy Number 16. <br /> b) The BORROWER agrees that it shall execute the following documents, all of which shall set forth <br /> the revised loan amount of$202,000: <br /> Amendment No. 1 to Loan Contract C150357 <br /> Page 1 of 3 <br /> Effective Date: 1/6/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.