Laserfiche WebLink
CONTRACT AMENDMENT <br /> Amendment Original Loan Contract No. C150375 Amendment No.1 CMS #73079 <br /> No.1 CMS No.62196 CORE 2015-10 <br /> CORE 2015-10 <br /> 1) PARTIES <br /> This Amendment No.1 (AMENDMENT) to the above-referenced ORIGINAL LOAN CONTRACT (hereinafter <br /> called the ORIGINAL CONTRACT) is entered into by and between the Consolidated Home Supply Ditch <br /> and Reservoir Company, do Northern Colorado Water Conservancy District, 220 Water Ave. <br /> Berthoud, Colorado, 80513, (hereinafter called "BORROWER") and the STATE OF COLORADO <br /> (hereinafter called the "STATE") acting by and through the Department of Natural Resources, <br /> Colorado Water Conservation Board, (hereinafter called "CWCB"). <br /> 2) EFFECTIVE DATE AND ENFORCEABILITY <br /> This AMENDMENT shall not be effective or enforceable until it is approved and signed by the <br /> Colorado State Controller or designee (hereinafter called the "EFFECTIVE DATE"), but shall be <br /> effective and enforceable thereafter in accordance with its provisions. <br /> 3) FACTUAL RECITALS <br /> The Consolidated Home Supply Ditch and Reservoir Company submitted, in writing to CWCB, a <br /> request for an increase to the loan contract total amount of its existing CWCB LOAN CONTRACT <br /> NUMBER C150375 for the Emergency Big Dam Diversion Structure Repair(PROJECT). The purpose <br /> of the Project is to repair damages to the diversion structure and ditch caused by the 2013 flood <br /> event. The requested increase in loan contract total amount is due to additional flood mitigation <br /> improvements that were identified during design and construction. At its September 11, 2014 <br /> meeting, the CWCB found that the Project required additional improvements and approved a loan <br /> contract increase of$240,000 for project costs and $2,400 for the 1% service loan fee with a total <br /> loan increase of$242,400. This request increases the existing CWCB loan contract total amount <br /> from $1,616,000 to $1,858,400. <br /> 4) CONSIDERATION <br /> Consideration for this AMENDMENT to the ORIGINAL CONTRACT consists of the payments that shall be <br /> made pursuant to this AMENDMENT and ORIGINAL CONTRACT and the promises and agreements herein <br /> set forth. <br /> The Parties acknowledge that the mutual promises and covenants contained herein and other good <br /> and valuable consideration are sufficient and adequate to support this AMENDMENT. <br /> 5) LIMITS OF EFFECT <br /> This AMENDMENT is incorporated by reference into the ORIGINAL CONTRACT, and the ORIGINAL <br /> CONTRACT and all prior amendments thereto, if any, remain in full force and effect except as <br /> specifically modified herein. <br /> 6) MODIFICATIONS. <br /> The ORIGINAL CONTRACT NO. C150375 and all prior amendments thereto, if any, are modified as <br /> follows: <br /> a) Amend this contract to increase the loan contract total amount by$242,400 increasing the Loan <br /> Contract total amount from $1,616,000 to $1,858,400. The terms for the additional loan amount <br /> are the same as the original contract; no payments for the first three years followed by 27 years <br /> of amortized payments. The interest is zero interest for the first three years, followed by 1.95% <br /> for the remaining 27 years. <br /> b) The BORROWER agrees that it shall execute the following documents, all of which shall set forth <br /> the revised loan contract total amount of$1,858,400: <br /> Amendment No. 1 to Loan Contract C150375 <br /> Page 1 of 3 <br />