My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150296 Extention Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150296 Extention Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:05:01 PM
Creation date
12/16/2013 10:22:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-058
C150296
Contractor Name
Gypsum, Town of
Contract Type
Loan
County
Eagle
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br /> Colorado Water Conservation Board 1ER CONSFk <br /> Water Supply Planning & Finance Section ��?�.oFAotoG,,�� <br /> 1580 Logan Street,Suite 600 F care s <br /> Denver,Colorado 80203 °; 0; <br /> www.cwcb.state.co.us �`,katai <br /> x ' ..../876 . <br /> 'X93.1 <br /> LETTER AGREEMENT John W.Hickenlooper <br /> Governor <br /> December 10,2013 Mike King <br /> DNR Executive Director <br /> Town of Gypsum,acting by and through its Water Activity Enterprise <br /> Attn: Jim Hancock,P.E.,Town Engineer James Eklund <br /> PO Box 130 CWCB Director <br /> Gypsum,Colorado 81637 <br /> Subject: Extension of Time for Performance in Loan Contract No.C150296 <br /> Dear Mr.Hancock: <br /> The Time for Performance stated in Appendix 1, Section 10 of Loan Contract No. C150296 for the Town of <br /> Gypsum, acting by and through its Water Activity Enterprise, was four years from the effective date of the contract <br /> or September 1, 2013. A request for a three (3) year extension has been requested by the Town of Gypsum, <br /> providing a new loan contract expiration date of September 1,2016.By signing below,the Town of Gypsum,acting <br /> by and through its Water Activity Enterprise and the CWCB acknowledge that the new Time for Performance in <br /> Appendix 1, Section 10,of the Loan Contract No.C150296 shall read: Seven(7)years from the Effective Date of the <br /> Contract.This extension shall make a new Time for Performance finish date of 09/01/16. <br /> Please have this letter signed by an authorized signer for the Town of Gypsum, acting by and through its Water <br /> Activity Enterprise, and return this letter, with original signatures, to Peg Mason, Contracts Manager, Finance <br /> Section,at the address listed above.Once executed,CWCB will send a copy for your records. <br /> Town of Gypsum,acting by and through its Water STATE OF COLORADO <br /> Activity Enterprise JOHN W.HICKENLOOPER,GOVERNOR <br /> f1 DEPARTMENT OF NATURAL RESOURCES <br /> By �..C1-� i z /e) 70/3 COLORADO WATER CONSERVATION BOARD <br /> Signature Date <br /> Shrdil, -T6wm e'r <br /> Name and Title By la_ / <br /> Kirk Russell,P.E.,Chief Date <br /> Attest: Finance&Administration Section <br /> By L( 1 -J <br /> Signature !Date <br /> 5e-kt,dei -Tier) Ne)(R' <br /> Name and Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.