My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150373 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150373 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2015 8:21:39 AM
Creation date
10/22/2013 10:56:07 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-035
C150373
Contractor Name
Big Thompson and Platte River Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866-4474 <br />www. c wcb. state. co. us <br />October 22, 2013 <br />John W. Hickenlooper <br />Governor <br />Mike King <br />DNR Executive Director <br />Big Thompson and Platte River Ditch Company <br />James Eklund <br />Attn: Gene Kammerzell <br />CWCB Director <br />22465 State Hwy 60 <br />Milliken, CO 80543 <br />Re: Emergency Big Thompson and Platte River Diversion Structure Repair <br />Contract Number C150373 <br />Mr. Kammerzell:. <br />I am pleased to inform you that on October 21 St, 2013 the Colorado Water Conservation Board <br />approved your loan request for the Emergency Big Thompson and Platte River Diversion <br />Structure Repair as described in the application and approved Loan Feasibility Study titled <br />"Emergency Loan Application and Feasibility Study", dated October 2013. The Board approved <br />a loan not to exceed $808,000 ($800,000 for project costs and $8,000 for the 1% Loan Service <br />Fee). The loan terms shall be three years of no interest followed by 27 -years at a blended <br />interest rate of 1.85% per annum. <br />I have attached a copy of the updated Board memo dated October 22, 2013, that includes the <br />Board's approval. <br />After the Board approves a loan there are a few steps that remain in the loan process including: <br />A) Contracting: An approved contract must be in place before funds can be disbursed. Peg <br />Mason will contact you to initiate the loan contracting process for this project. When all of <br />the contract conditions are met and the contract is executed the Company may request loan <br />funds to cover eligible project expenses. You can reach Peg at (303) 866 -3441 x3227. <br />B) Design/Construction: You must adhere to the CWCB Design and Construction <br />Administration Procedures. The Project Manager will contact you for this phase of the <br />process and will work with you on the disbursements of your loan funds. <br />Collaboration: The Borrower is encouraged to consider rebuilding a river. diversion system <br />which improves the consumptive and nonconsumptive uses of the river corridor. Examples <br />include improved fish passage, improved raftingiboating navigation, and possible shared <br />ownership /use of a single diversion structure where possible. If needed, loan funds may be <br />Interstate Compact Compliance - Watershed Protection - Flood Planning & Mitigation - Stream & Lake Protection <br />Water Project Loans & Grants - Water Modeling - Conservation & Drought Planning - Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.