My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150323 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150323 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2012 9:21:03 AM
Creation date
7/19/2012 9:19:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150323
Contractor Name
Jackson Ditch Company, The
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JACKSON DITCH COMPANY <br />CHECK DAM REHABILITATION PROJECT <br />Project Description <br />The Jackson Ditch Company is responsible for the average annual delivery of 5,500 AF of irrigation <br />water to its 75 shareholders. This project was for the rehabilitation of the check dam structure on the <br />Cache la Poudre River. The river splits and flows around an island just upstream of the Company's <br />diversion headgate. When flows are particularly low the structure is utilized to convey flows to the <br />east side of the island where they can be diverted through the headgate. The concrete check dam had <br />been in place since the 1960's, but has recently fallen into disrepair, preventing the Company from <br />diverting its most senior water rights at times. The project provides a long -term, low maintenance <br />solution for restoring the ability to deliver water to shareholders during times of extreme river <br />conditions. Construction was completed in the summer of 2012. <br />Project Data <br />Sponsor: Jackson Ditch Company <br />County: Larimer <br />Water Source: Cache la Poudre River <br />Substantial Completion: July 1, 2012 <br />Terms of Loan: $124,533 ($112,958 drawn) for 30 years @ 3.60% <br />Design Engineer: Andek Consulting, Fort Collins, CO <br />Contractor: Connell Resources, Inc., Fort Collins, CO <br />Project Elements: 53 CY concrete check dam structure and footing with steel control gate <br />
The URL can be used to link to this page
Your browser does not support the video tag.