My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150013 proj summary
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150013 proj summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:00:21 PM
Creation date
3/10/2011 9:17:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150013
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�, r• <br />�. <br />-, . -=.-� _ �.,. <br />� _+��. _ ,... <br />� � , � - , :.,r •.%,.••;,.. . <br />'�i'�s.�-�r --'t'` " , <br />� <br />- __....---� -.�- <br />_ `�: <br />��•FJ�'� � ' , '"'�'�i <br />, � �' ? <br />,�` "si. , �- . � . . : " ' <br />� ��� <br />� �� <br />: . . <br />,. • �`�:�� � s.. a, � M.. ;� <br />. � <br />-� <br />t...' • <br />� <br />" _ .. � , y" . . " ' �, � � �y � . <br />. .. _.. . • . . -.�_ �. _ . , . � <br />Q <br />Project Description <br />The North Poudre Irrigation Company operates 22 reservoirs, having a total storage capacity <br />of 64,000 acre-feet, servicing an area of approximately 42,000 acres. This project involved the <br />rehabilitation of Reservoirs No. 4 and No. 5, and Indian Creek Reservoir, having a total capacity of <br />19,850 acre-feet. Improvements to Reservoir No. 5 included spillway enlargement and reshaping <br />of the dam crest, which were designed and completed in 1999. Improvements to Indian Creek <br />Reservoir involved a new 500-ft. long spillway, replacement of the outlet structure, new toe drains, <br />and reshaping the downstream dam face, which were designed in 2001 and constructed in 2003. <br />The Company has elected not to improve Reservoir No. 4 at this, with the intent to rehabilitate the <br />reservoir at a later date under a separate contract. <br />Proiect Data <br />Sponsor: North Poudre Irrigation Co. County: Larimer Water Source: S. Platte River <br />Terms of Loan: $623,777.90@4.04% for 20-years Substantial Completion Date: May 1, 2004 <br />Design Engineer: Smith Geotechnical, Inc. — Fort Collins, Colorado <br />Construction Contractor: Reservoir No. 5— Barker Construction, Inc. — Ft. Collins, Colorado <br />Indian Creek Reservoir — Zak Dirt, Inc. — Longmont, Colorado <br />Annual Amount of Water Delivered = 30,000-50,000 Acre-Feet <br />NORTH POUDRE IRRIGATION COMPANY <br />SYSTEM REHABILITATION PROJECT <br />Indian Creek Reservoir Spillway Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.