My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Boulder Canyon Project Adjustment Act - In the Senate and House of Representatives of the US: A Bill
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Boulder Canyon Project Adjustment Act - In the Senate and House of Representatives of the US: A Bill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 2:37:26 PM
Creation date
7/19/2010 1:45:36 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Laws, Acts, and Policy Rulings Accedting CWCB and Colorado Water
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1937
Title
Boulder Canyon Project Adjustment Act - In the Senate and House of Representatives of the US: A Bill
Water Supply Pro - Doc Type
Legislation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A B I L' L. <br />Authori=zing the Secretary of the Interior to promulgate and to put <br />into effect charCes for electrical energy generated at Boulder Darn, <br />providing, for the application of revenues from said project, authorizing <br />the operation of the, Boulder Power Plant by the United S'tat es directly <br />or through ag ,and for other purposes, <br />Be_ it enacted b the Senate', and House of _,Re 'resentatives of the <br />United. States ,of America in'Contress assembled. <br />SECTION i1�;:. The Secretary of the Interior is hereby authorized and <br />directed to promulgate' charges, or the basis of.,computation thereof, for <br />electrical energy generated at Boulder Dam during the period beginning- <br />June 1, 1937, and ending I.IaY 31, M7 estimated to be sufficient,.together <br />with other net revenues from the project, to accomplish the following pure. <br />poses: <br />(a) To meet the cost of bperation, maintenance and replacements of <br />the. Project during the period beginning June 1, 1937 and ending -Day 31, <br />198'j# <br />(b) To repay 'to the - Treasury, _with interest, - the advances to the <br />Colorado River Dam fund for , the Project .made prior to June 1, 1937, within <br />fifty years from that date (excluding advances allood dd to flood control <br />by Section •2(b) .of' the Project Act, which shall be repayable as provided <br />in Section 7 hereof), and advances made on and after June 1, 1937 within <br />such fifty year period or periods as the Secretary m€j determine. <br />(c) To provides ��b00,000 for eaoh - of the years and for the prupose <br />specified'in Section 2(c) hereof; ' and <br />(d) To provide 5 500;O00 for� of the years ,and for the purposes <br />specified in'Section-20) hereof. <br />k i <br />
The URL can be used to link to this page
Your browser does not support the video tag.