My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150281 proj completion ltr
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150281 proj completion ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:17:41 PM
Creation date
6/16/2010 11:35:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150281
Contractor Name
Water Supply and Storage Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />FAX: (303) 866 -4474 <br />www.cwcb.state.co.us <br />April 26, 2010 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. Dennis J. Harmon, Manager <br />Water Supply and Storage Company <br />P.O. Box 1584 <br />Fort Collins, CO 80522 <br />Re: Contract Number C150281— Grand River Ditch and Kluver Reservoir Outlet Projects <br />Dear Mr. Harmon: <br />Bill Ritter Jr. <br />Governor <br />James B. Martin <br />DNR Executive <br />Director <br />Jennifer L. Gimbel <br />CWCB Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />April 1, 2010. <br />In accordance with the Contract, you owe $11,155.29 for interest during construction, as calculated on the attached <br />spreadsheet. As requested, the $11,155.29 in accumulated interest has been transferred to principal, which is illustrated on the <br />attached spreadsheet. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $39,270.64 is <br />due on April 1, 2011. A 1% loan service fee of $6,975.29 was added to your principal balance of $697,528.62, for a final loan <br />balance of $704,503.91. An adjustment of $138,846.09 has been subtracted from your approved loan balance of $843,350.00, <br />since these loan funds will not be needed. Please see the attached Loan Repayment Schedule. Vaughn McWilliams, our Contract <br />Administrator, will be in contact to amend the Promissory Note. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Water Supply and Storage Company <br />on the successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service <br />to you in the future. <br />CC. Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Tim Feehan, P <br />Chief, Finan Section <br />Contract Amount = $843,350.00 <br />Expended Amount = $704,503.91 <br />Flood Protection • Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.