My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150146 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150146 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2011 9:06:38 AM
Creation date
5/6/2010 10:58:31 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150146
Contractor Name
Rothe, Mildred L.
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � <br />� <br />130RROWER: ROTHE, MILDRED <br />Contract No. C150146 <br />Original Loan Amount $357,017 <br />Adjustment (Increase): $26,237 <br />Adjusted Loan Amount $383,254 <br />Agency Name: Water Conservation B ard <br />Agency Number PDA <br />Routing Number: 04 PDA � <br />LOAN CONTRACT AMENDMENT NO. 1 <br />(STANDARD CONTRACT — WAIVER #160 — APPROVED NOVEMBER 1 O, 2003) <br />This Amendment, made this April 1, 2004, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ("CWCB"), and Mildred L. Rothe, 15160 Highway 144 #16, Fort <br />Morgan Colorado 80701, a Colorado individual (" BORROWER " or " CONTRACTOR "). <br />FACTUAL RECITALS <br />A. Authority exists in the law, and funds have `been budgeted, appropriated, and <br />otherwise made available for payment in Contract Encumbrance Number C150146. <br />B. Required approval, clearance, and coordination have been accomplished from and <br />with appropriate agencies. <br />C. The CWCB and the BORROWER entered into Contract Encumbrance Number <br />C150146, dated September 1, 2003, (" ORIGINAL CONTRACT incorporated herein by <br />reference, wherein the CWCB agreed to loan money in the total amount up to <br />$357,017, and the BoRROwER agree t the loan in accordance with the terms <br />Of th2 ORIGINAL CONTRACT. <br />D. During construction of the Pro�, e B R encountered unforeseen site <br />conditions, design modifications, n ditional work due to changes <br />instituted by a regulatory ag t c in the original project cost estimate. <br />These items increased the co e ROJECT by $28 ,863. To meet the increased <br />costs, the BoRROwER requested an additional $26,237 for a total loan amount of <br />$383,254. <br />E. At its March 2004 meeting, the CWCB approved increasing this loan by $26,237 <br />($25,977 for Project costs and $260 for the 1% Loan Service Fee In accordance with <br />CWCB Policy No. 16) for a total loan amount of up to $383,254. The terms for the <br />additional loan amount are an interest rate of 2.5% per annum and a repayment <br />period of 30 years. <br />F. The CWCB and the BoRROwER have agreed to amend this contract to increase the <br />amount of the loan by $26,237. <br />NOW THEREFORE, it is hereby agreed that <br />1. Consideration for this Amendment to the ORi�iNa� CoNrRacT consists of the payments <br />that shall be made pursuant to this Amendment and the ORi�iNa� CoNTRa,cT, and the <br />promises and agreements herein set forth. <br />2. 2. It is expressly agreed by the parties that this Amendment is supplemental to the <br />ORIGINAL CONTRACT and all terms, conditions, and provisions thereof, unless <br />specifically modified herein, are to apply to this Amendment as though they were <br />expressly rewritten, incorporated, and included herein. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.