My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 (7)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
10 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:56 PM
Creation date
8/5/2009 11:22:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/19/2009
Description
CF Section - New Project Loans - Farmer's Reservoir and Irrigation Company - Milton Reservoir and Barr Lake Improvements Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 - 3441 <br />Fax: (303) 866 - 4474 <br />www.cwcb.state.co.us <br />Bill Ritter, Jr. <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Harris D. Sherman <br />DNR Executive Director <br />FROM: Anna Mauss, P.E. <br />Jennifer L. Gimbel <br />Mike Serlet, P.E., Chief <br />CWCB Director <br />Water Supply Planning and Finance Section <br />Dan McA uliffe <br />CWCB Deputy Director <br />DATE: July 14, 2009 <br />Agenda Item 10, July 21 - 22 2009 Board Meeting <br />SUBJECT: <br />Water Supply Planning and Finance Section – New Project Loans <br />Farmers Reservoir and Irrigation Company – Milton Reservoir and Barr <br />Lake Improvements Project <br />Introduction <br />The Farmers Res ervoir and Irrigation Company (Company ) is applying for a $3,500,000 loan <br />from the CWCB to construct the Milton Reservoir and Barr Lake Improvements Project <br />(Project). The purpose of this Project is to replace the upstream outlet gate structure and repair <br />the piped outlet works through the dam at Milton Reservoir, enlarge the existing spillway at <br />Milton Reservoir, and enlarge the existing spillway and raise the perimeter dike at Barr Lake. <br />The estimated total cost of the project is $3,8 44 ,000. See the attached Project Data Sheet for a <br />location map and project summary. <br />Staff Recommendation <br />Staff recommends the Board approve a loan not to exceed $3,535,000 ($3,500,000 for project <br />costs and $35,000 for the 1% Loan Service Fee) to the Farmers Reservoir and Irrigation <br />Company to construct the Milton Reservoir and Bar r Lake Improvements Project from the <br />Construction Fund. The loan terms shall be 30 years at a blended rate of 3.7% per annum. <br />Security for the loan shal l be in compliance with CWCB Financial Policy #5. <br />Water Supply Protection • Watershed Protection & Flood Mitigation • Stream & Lake Protection • Water Supply Planning & Financ e <br />Water Conservation & Drought Planning • Intrastate Water Management & Develo pment <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.